π Tender Overview
Contract Award for Contract awarded for New construction chemistry s11 and construction of square
lot-0001, title: new construction chemistry s11 and square development, description: ghent university plans the new construction of a research building for the departments 'we06 - chemistry' and 'we07 - organic and macromolecular chemistry' on its de sterre campus. both departments are already located on campus and will establish themselves under one roof in the new project to optimally utilize the necessary infrastructure. the new research building is planned to be located on the side of de pintelaan, directly adjacent to the property boundary and centrally located between buildings s8, s9, s10, and s30. s11 is intended to form the face of the 'logistics cluster'. s11 is literally located on the boundary between a secure logistics zone that is not accessible to the public and a more transparent side accessible to researchers and students. the project includes the following program: - offices and supporting rooms for over 200 ftes - research laboratories and supporting rooms - logistics zone (including loading and unloading area, pmge rooms, waste rooms, gas storage, climate chambers, etc.) - bicycle storage, waste storage, and fencing with sliding gate - outdoor development with bike path, infiltration facility, and helophyte filter the project does not include educational functions and is fully organized as a research building where university staff (permanent academic staff, doctoral students, etc.) will conduct their research. it involves a task with very high technical complexity and significant interaction between various disciplines. the task includes both earthworks and drainage works, structural works, finishing, hvac installation, electrical installations, sanitary installations, installations for technical gases, fire detection, data cabling, pv installation, environmental development, and water purification installations. a beo field is also included in the project. the new building consists of 6 above-ground floors and 2 basement levels. there is a limited extension of 2 floors with a flat roof. a low construction is planned at the street side as bicycle storage, waste storage, and gas storage. the flat roof here is provided with an extensive green roof. the ground floor includes public functions such as an entrance hall, reception desk, and consumption room, as well as logistical functions such as storage spaces with a central warehouse and specific laboratories including (metal-free) cleanrooms and an nmr expertise center. the first floor includes offices on the street side and public functions such as meeting rooms and seminar space. floors +2 to +6 contain offices on the south and west sides and laboratories on the north and east sides. the basement is mainly used as a technical space. there is an english courtyard on the logistics side for the supply of fresh air. the exhaust occurs above the roof. technical installations and the pv