📋 Tender Overview
Contract awarded for New building of the hospital wing lot-0001, title: new construction of the patient house, description: the new construction of the patient house will be built as a flat-founded, five-story building, including a basement, that cuts into the existing terrain. on the ground floor and the three upper floors, in addition to the patient rooms, there are the associated functional rooms. each floor contains the technical and medical infrastructure rooms (e.g., it/av/sv, as well as on the ground floor to the third floor the clean/dirty workrooms, disposal rooms, station kitchen, nurse stations). in the basement, among other things, the bed preparation, storage rooms, and rooms for building technology and utility connections, as well as the associated ancillary areas, are situated. the vertical access of the building from the basement to the third floor is provided by two stairwells, three elevators, and the necessary technical shafts. the attic is accessible via the northern stairwell. to illuminate and ventilate the depth of the building, a light well is situated in the southern part of the building from the ground floor to the roof. the horizontal access is provided via the corridors. in the basement, ground floor, and first floor, the building is connected to the existing buildings in the north and west via the so-called main corridors. the building technology is distributed horizontally within the suspended ceilings on the floors. in the basement, the supply and exhaust air of the rlt (room air technology) is realized via an earth shaft and an intake structure. the lower rlt central unit is connected horizontally via a duct to one of the main shafts in the north under the corridor above. the main accessibility for patients, visitors, and staff is provided through the building connections to the neighboring existing buildings. the evacuation of the building on the ground floor and basement occurs from the floors via the stairwells to the emergency exits from the main corridors on the ground floor and emergency exits in the basement. furthermore, the building can be accessed from the outside via two staircases that also function as emergency exits. outside the building is the location of the central heat generator of a heat pump. additionally, the staircases and the aforementioned ventilation structure with two towers in front of the east facade are planned. the utility connections have already been brought to the construction site and will be introduced into the building by the contractor during the construction of the building. the contractor owes the client all necessary planning to achieve the performance goal: if necessary, revision of the approval planning, execution planning, construction supervision, and fire protection supervision. the contractor owes the client a ready-to-use, fully functional patient house along with connection structures according to all contents of the functional performance description and all necessary services required for this: - is technically flawless and complies with the current standards, guidelines, and other relevant and applicable technical regulations as well as the valid laws and manufacturer guidelines concerning the type of building and building use - complies with the relevant occupational safety regulations - is fully operational - has been fully accepted and put into operation by all necessary publicly appointed or other expert inspectors and authorities - has been fully released for use in writing by the authority, the inspection engineers, experts, fire department, assessors, and other relevant public bodies and corporations - is free of defects. the contractor owes the client the aforementioned services within the agreed costs, qualities, and deadlines, including all necessary planning and construction services, materials, substances, and equipment, including construction supervision and coordination services and other services and measures, fees, permits, and agreements that are necessary to achieve the performance goal, even if these are not separately mentioned in the functional performance description. - the basement, including the connection structures in the basement that run to the existing building a, is to be constructed using conventional construction methods (e.g., reinforced concrete foundation / reinforced concrete walls / masonry / drywall) - the foundation of the above-ground connection structures is also to be constructed conventionally (e.g., flat foundation with frost skirts made of reinforced concrete, see also item in lv_foundation connection structure). from the ground floor, including the connection structures rising from the ground floor, the contractor can freely choose the construction method, e.g. - modular construction - serial construction - conventional construction - hybrid construction methods. estimated value excluding vat: 34916330.00 eur.New building of the hospital wing