📋 Tender Overview
Contract awarded for New building carl-orff school including media center - heating & sanitation lot-0001, title: new construction of carl-orff school including media center - heating & sanitary, description: the new building of the carl-orff school, including the media center on the site of the former pestalozzi school, is being developed as a compact building over two floors. as a contribution to climate justice, the building is being constructed as a wood hybrid building. the dimensions of the building allow for a compact, daylight-optimized construction method as well as optimized structural dimensions for a timber frame construction. the foundation is a shallow foundation on a reinforced concrete slab. the two stairwell cores and the elevator shaft are also made of reinforced concrete. the other interior walls will largely be constructed in timber frame or solid wood construction. this construction method allows for a highly flexible and adaptable interior design with lightweight partition walls. the ceiling above the ground floor will be constructed as a wood-concrete composite ceiling for acoustic reasons, while the beam structure of the wooden beam ceiling will remain visible in large parts above the upper floor. the ceilings are supported at points by columns and in places by load-bearing solid wood walls made of cross-laminated timber. the serial prefabrication of entire wall elements guarantees construction quality and reduces assembly times on site. access to the construction site is via beckstraße, with traffic safety to be observed. before the start of work, executing companies and suppliers must be explicitly instructed by the contractor. building key data: gross floor area according to din 277: 2,993 m2 net room areas according to din 277: 2,653 m2 enclosed space according to din 277: 13,252 m3 building class: 3 foundations/floors/ceilings: reinforced concrete roof areas: flat roofs with insulation and sealing. greening and pv system approximately 400 m2 on the roof areas the obligations provided for in this procedure serve to implement a new construction project for which funding has been approved through the program "climate-friendly new construction - municipalities" (498, 499) of the federal ministry for housing, urban development and building (bmwsb) at kfw. heating and sanitary work - district heating transfer station and accessories - heat generation systems - underfloor heating - sanitary objects. estimated value excluding vat: 267286.74 eur.New building carl-orff school including media center - heating & sanitation