📋 Tender Overview
Contract awarded for Nbhl_403_air conditioning systems lot-0000, title: nbhl_403_air handling systems, description: - 1 x rlt hall dehumidification = 30,000 m3/h / 1 x rlt changing room, adjacent = 17,500 m3/h / rlt technology = 4,000 m3/h - multi-split air conditioning with 4 x indoor units - approx. 2,200 sqm duct/form parts - approx. 400m spiral duct dn 100 - 280mm, along with fittings/connectors - approx. 26 bsk - approx. 193 swirl outlets, tv valves, grilles, long throw nozzles - approx. 66 silencers (backdrop/duct) - throttle and control devices estimated value excluding vat: -1.00 eur.Nbhl_403_air conditioning systems