📋 Tender Overview
Contract awarded for N01.20 mp-260003 - ep weyermannshaus - wankdorf - project author construction (id 12162) lot-0000, title: n01.20 mp-260003 - ep weyermannshaus - wankdorf - project author construction (id 12162), description: the city bypass bern is one of the most heavily trafficked sections of national roads. from 2008 to 2012, the city bypass was extensively renovated, with the surfaces replaced and numerous inventory objects renovated and reinforced. in addition, noise protection was expanded in the affected sections and adapted to the requirements at that time. meanwhile, about 15 years have passed, and the condition of the surface layers has noticeably deteriorated. in recent years, surface damage has increased, leading to a rise in short-term necessary maintenance measures (kbu). therefore, within the project perimeter, a uema surface replacement and a preservation project will be carried out. the project perimeter includes the following four national road sections: · n01.16 (connection bethlehem – forsthaus) · n01.20 (forsthaus – junction wankdorf) · n06.32 (junction wankdorf – connection wankdorf) · n12.84 (connection bümpliz – junction weyermannshaus) this procurement includes the mandate for the project author construction for the bridging measure (phases 32-53) and the preservation project (phases preservation concept (ek) up to and including planning approval procedure (pgv) - the project will be created using the planning method bim. description of the mandate project author construction: · bridging measure (uema) surface replacement (planning + realization) · preservation concept (ek) up to planning approval procedure (pgv) during the planning and realization of the uema surface replacement, a preservation concept (ek) for the section should be created. based on the condition assessment provided by astra, as well as additional condition assessments to be carried out by the contractor, a preservation concept (ek) and subsequently a measures concept (mk) or a submission project (ap) should be developed. the contractor accompanies the project up to and including the planning approval procedure (process support, handling of objections). in total, there are 146 inventory objects (io) divided into the following areas: - route / environment: 42 - structures: 52 - tunnels / geotechnics: 43 - bsa: 3 - foreign objects: 6 estimated value excluding vat: 7008014.90 chf.N01.20 mp-260003 - ep weyermannshaus - wankdorf - project author construction (id 12162)