📋 Tender Overview
Contract awarded for Multi-year maintenance of dmz network tunnels and bridges lot-0000, title: multi-year maintenance dmz network tunnels and bridges, description: dmz network tunnels and bridges the municipality of the hague designed, supplied, and integrated a dmz network in 2018-2019 to perform the operation and monitoring of road tunnels and bridges more efficiently. a dmz network (demilitarized zone) is a secure subnet that provides an extra layer of protection between an internal network and external networks, such as the internet. the following objects and locations are connected to the dmz network tunnels and bridges of the municipality of the hague: road tunnels: victory boogie woogie tunnel; hubertus tunnel; koning tunnel; bridges: binckhorst bridge; laak bridge; trekvliet bridge. locations: control center scheveningen; secondary control center; municipality of the hague. in the realization of the network, the municipality of the hague agreed on a maintenance contract with the implementing party for a maximum duration of 7 years. this maintenance contract will expire in september 2026. assignment to keep the dmz network available and reliable, the municipality of the hague (hereinafter: client) wishes to conclude a multi-year maintenance contract through this tender procedure with one contractor for an initial term of six (6) years. the client wants the dmz network to continue functioning independently and securely with high availability and reliability. maintenance must be carried out in such a way that all systems continue to function within the defined failure definitions. for the multi-year maintenance, the client wishes to enter into a performance-oriented maintenance contract. it is the contractor's responsibility to determine which activities need to be performed within the maintenance contract to meet the (functional) requirements of the client. the client wants to approach the contract with the contractor as results-oriented as possible. this is reflected in the inclusion of requirements regarding the availability and reliability of the network in the program of requirements. the contractor is expected to fully relieve the client in the area of operational management and maintenance of the dmz network. the following activities broadly fall within the scope of the assignment (not exhaustive): preventive and corrective maintenance; installation responsibility; maintenance registration; fault registration and analysis; inventory and warehouse management; information management; reporting and consultation; continuous improvement. the scope of maintenance concerns the network systems that belong to the dmz network in (technical rooms of) the various objects. the objects and locations are connected with fiber optic cables in a network configuration. these fiber optic cables are leased lines from ziggo and are not part of the scope. the current maintenance contract for the dmz network expires on september 8, 2026. according to the planning (see paragraph 2.3), awarding can take place from july 31, 2026. there is then a short transition period between the new contractor and the current contractor, namely from a maximum of july 31, 2026, to september 8, 2026. for the awarding, a plan of approach is requested for the component 'quality' to ensure that the transition period proceeds as efficiently as possible. the contractor must take over the current network from september 8 to then create a design for the upgrade of the network for both hardware and software. optional scope replacement of network components (including extension of multi-year maintenance) to keep the dmz network up-to-date, periodic replacement of network components (switches, firewalls, and servers) is necessary. in about 6 years, various components will reach/approach the end of their technical or economic lifespan, and replacement will be necessary. the agreement provides an option for this replacement to be carried out by the contractor, linked to an extension of the multi-year maintenance for a duration of six (6) years. integration of new objects the dmz network was developed to be scalable so that new objects can be integrated in the future. the agreement takes into account the expansion of the number of objects connected to the dmz network, through an option to extend the maintenance of the network to the maximum capacity in the control center, with a maximum of 3 road tunnels and 4 movable bridges that can be connected to the network in addition to the current objects. changes in scope renovation of 4 movable bridges (4bb) the municipality entered into an agreement in 2025 with a contractor for the renovation of 4 movable bridges (the 4bb project). the renovation of the laak bridge and the trekvliet bridge is part of the scope of this agreement, and the renovation of both bridges will take place within the term of the agreement for the maintenance of the dmz network. after the renovation is completed, the maintenance scope within the agreement of the dmz network regarding the laak bridge and trekvliet bridge will change/cease. this concerns the components belonging to the local object and the control centers scheveningen/secondary control center. the connection with the dmz network will remain. renewal of binckhorst bridge the municipality of the hague is currently preparing for the renewal of the binckhorst bridge. the renewal is expected to take place from the year 2028 and will therefore be carried out within the term of the agreement for the maintenance (components of the local object) of the dmz network. after the project is completed, the maintenance scope within the dmz network regarding the binckhorst bridge will change/cease. estimated value excluding vat: 3510119.06 eur.Multi-year maintenance of dmz network tunnels and bridges