📋 Tender Overview
Contract awarded for Mindener parking garage gmbh - new construction parking garage marienwall lot-0001, title: mindener parkhaus gmbh - new construction of the marienwall parking garage, description: the subject of the contract includes the services and service profiles of the hoai for the following planning services to a general planner: - object planning for buildings according to §§ 33 ff. hoai, service phases 1 to 9 - specialist planning of structural engineering according to §§ 49 ff. hoai, service phases 1 to 6 - specialist planning of technical equipment according to §§ 53 ff. hoai, service phases 1 to 9 - object planning for outdoor facilities according to §§ 38 ff. hoai including necessary engineering structures according to § 41 ff hoai and traffic facilities according to § 45 ff. hoai service phases 1 to 9 - building acoustics (sound insulation) according to annex 1.2.4, service phase 1 to 8 as well as sound insulation reports - fire protection according to aho series of publications no. 17, service phases 1 to 8 - lighting reports for the exterior and interior of the area of application - project organization it is planned to create a draft document for construction and subsequently to create a functional service description for a subsequent general contractor assignment. service phases 1 - 3 - basic determination, preliminary planning, and design planning in relation to the planning services, all partial services of service phases 1 - 3 must be provided. since the system-related construction types are not yet known, a preliminary statics must be created for the specialist planning of structural engineering, on the basis of which the general contractor (gu) creates the statics for its construction type, provided that the construction type is left open. service phase 4 - approval planning the approval planning is to be prepared by the general planner. service phase 5 - execution planning the execution planning is generally provided by the general contractor commissioned with the construction of the parking garage. after the commissioning, the general contractor (gu) prepares the working and detail planning of all planning areas (building construction, statics, tga, etc.) to the requested or necessary extent. in doing so, it fundamentally adopts the design planning underlying the commissioning and adapts it to its offered system. for this reason, the design should leave room for the system-related construction differences to avoid insurmountable problems in this regard. the general contractor is fully responsible for the technically correct and standard-compliant execution as the work planner and simultaneously executing construction company. a commissioning with the basic services of service phase 5, with the exception of the updating of the schedule according to the service profile according to hoai, is therefore not necessary. instead, a functional service description (flb) is a special service. the flb is created based on the design planning. since each general contractor plans with different component constructions, routing, detail designs, etc., depending on the construction type, the desired function and quality of the components must be described and demanded in the functional service description. the flb should be supplemented by the planning of selected design or constructive lead details. service phase 6 - preparation of the award the award is based on a functional service description (flb) as well as the presentation and visualization of materials and equipment, so that the basic services of service phase 6 are essentially omitted. service phase 7 - award based on the flb, the bidders submit fixed-price offers for their general contractor services. additionally, a description should already be submitted with the offer and checked for compliance with the requirements of the specific project as well as the flb. the execution of the award procedure is carried out by the client, and the contractor must participate in the award and in particular carry out the technical examination of the offers. service phase 8 - object supervision the coordination of the planners and companies (subcontractors) involved by the gu as well as the supervision of the correct and standard-compliant execution in the work and on the construction site is solely the responsibility of the general contractor. the accompaniment of the construction execution and ensuring compliance with the functional and qualitative requirements described in the flb is carried out by the contractor. service phase 9 - object maintenance in the context of the building's object maintenance, all partial services of service phase 9 must be provided in the event of commissioning. the client initially commissions only service phases 1 to 2 according to hoai. there is no entitlement to further commissioning, nor can any other contractual obligations arise for the client from this. in the event of a call-off, the contractor is obliged to provide the services, possibly also in stages. estimated value excluding vat: 580968.96 eur.Mindener parking garage gmbh - new construction parking garage marienwall