Awarded Mid Inspection Tender

🏛️ Zse Power Plants, Ltd.
📄 Tender ID: 15762412 📅 Published: 24 Nov 2026

📋 Tender Overview

Contract awarded for Mid inspection of the high-pressure part and major inspection of the low-pressure and medium-pressure part of the steam turbine sst5-3000 including the supply of spare parts for the malženice power plant. lot-0001, title: mid inspection of the high-pressure part and major inspection of the low-pressure and medium-pressure parts of the sst5-3000 steam turbine including the supply of spare parts for the malženice power plant, description: the subject of the contract is to carry out a mid inspection of the high-pressure part and a major inspection of the medium-pressure and low-pressure parts of the sst5-3000 steam turbine at the malženice power plant and to supply spare parts and strategic spare parts necessary for the planned inspection. the inspection will be carried out during the planned outage of the malženice power plant in 2028. the sst5-3000 steam turbine was commissioned in january 2011. the power plant was preserved from 2013 to 2018 and has been back in operation since january 2019. in 2028, the turbine will reach approximately 100,000 equivalent operating hours. the scope of the inspection is based on the operational condition of the equipment, the number of equivalent operating hours, and the equipment control plan no. no 2-4-m-603-m0027/1-3. the contracting authority is carrying out the subject of the contract in two phases. phase 1 includes inspection services and phase 2 includes the supply of spare parts and strategic spare parts. these are materially and technically related performances tied to the same turbine and the planned inspection, with each phase having a separate subject of negotiation and a separate contractual relationship. phase 1 includes carrying out a mid inspection of the high-pressure part and a major inspection of the medium-pressure and low-pressure parts, including professional activities necessary for the inspection of the equipment, assessment of the technical condition of the inspected parts, and evaluation of findings after opening the turbine. the results of the inspection will serve as a basis for determining any measures arising from the identified technical condition. phase 1 will be carried out based on a separate contract for work. negotiations on the technical, contractual, and price conditions of phase 1 are ongoing. phase 2 includes the supply of spare parts and strategic spare parts for the sst5-3000 identified in connection with the planned inspection, which need to be secured before its implementation. the contracting authority based the scope on parts identified by the manufacturer, checked its own stock inventory, and excluded parts it already possesses. the subject of phase 2 includes only parts that the contracting authority does not have available and whose need can be identified before opening the turbine. parts whose need can only be determined based on the actual technical condition after opening the turbine are not the subject of the purchase agreement; their potential procurement will be assessed separately based on the established factual circumstances and the public procurement act. the manufacturing and delivery time for the parts is approximately 12 months. negotiations in phase 2 have been completed, and the performance will be carried out based on a separate purchase agreement. the contracting authority used a direct negotiation procedure according to § 98 para. 1 letter b) point 2 and in relation to phase 2 also according to § 98 para. 1 letter e) of the public procurement act. before using the direct negotiation procedure, it checked the relevant market and the possibility of securing the required performance by another economic entity within the framework of preparatory market consultations. it assessed the ability to secure performance for the specific sst5-3000 turbine while maintaining its technical characteristics, design solution, and technical and functional compatibility. the manufacturer of the sst5-3000 turbine is siemens energy global gmbh & co. kg. the manufacturer has detailed design data, technical know-how, proprietary methodologies, and oem documentation for the specific equipment. these documents are not made available to third parties without the manufacturer's consent, and the contracting authority does not possess them to the extent necessary to provide them to another economic entity. siemens energy, s.r.o. is an affiliated company of the manufacturer authorized to act on its behalf. preparatory market consultations did not confirm the existence of another economic entity representing a reasonable and practically usable alternative. the verified alternative did not possess the proprietary technical documentation, design data, methodologies, and know-how of the manufacturer necessary for the sst5-3000, and the contracting authority cannot provide these documents to it. technical restrictions did not arise from an artificial narrowing of the subject of the contract but result from the design solution of the existing equipment and the manufacturer's disposition with the technical documents necessary to secure the performance. in phase 2, it is essential to maintain the technical and functional compatibility of the parts with the existing turbine. the dimensions, tolerances, material, technical, and functional properties of the parts are tied to the design solution of the turbine, manufacturing specifications, and oem documentation. changing the supplier would mean securing parts without complete proprietary technical documents from the manufacturer and could lead to differing technical characteristics, incompatibility, or unreasonable technical difficulties in the operation or maintenance of the equipment. in assessing the method of securing performance, the contracting authority considered the technical, operational, and economic consequences of available solutions, the conditions of insurance coverage for the technological equipment requiring service in accordance with the manufacturer's technical recommendations, and the significance of the malženice power plant for the electricity grid, including providing the supporting service 'black start'. therefore, it assessed the available solutions in terms of technical usability, compatibility, operational risks, and overall economic consequences, not just the price of individual performances. based on the market verification and the overall assessment of the stated facts, the contracting authority did not identify another reasonable and practically usable alternative or substitute that would allow securing the required performance while maintaining the technical requirements and compatibility of the sst5-3000 without creating unreasonable technical and operational risks. estimated value excluding vat: 885246.45 eur.Mid inspection of the high-pressure part and major inspection of the low-pressure and medium-pressure part of the steam turbine sst5-3000 including the supply of spare parts for the malženice power plant.

🔍 Key Information

📄
Tender Reference No.
15762412
📅
Publication Date
24 Nov 2026
💰
Estimated Value
€ 885246.44
🌐
Sector
N/A
📅
Deadline
24 Nov 2026
📝
Notice Type
Contract Awards
📍
Location
Slovakia
📑
Contract Duration
0 Day

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 24 Nov 2026
🔔 Set Alert

🧭 Quick Facts

Authority Zse Power Plants, Ltd.
Country Slovakia
State / UT N/A
Tender Type Contract Awards
Currency €
Similar Tenders
Loading similar tenders…