📋 Tender Overview
Contract awarded for Magistrate of the city of tann, rhönhalle tann - functional expansion through enhancement, conversion, and renovation as well as redesign of the outdoor facilities with playground - architectural services lot-0000, title: magistrate of the city of tann, rhönhalle tann - function expansion through enhancement, conversion, and renovation as well as redesign of the outdoor facilities with playground - architectural services, description: the city of tann (rhön) intends to expand the function of the rhönhalle with enhancement, conversion, and renovation as well as redesign of the outdoor facilities with playground. the existing building complex is to be brought to a contemporary standard functionally, aesthetically, and technically and further developed for future use as an event and meeting building. a variant study with a possible usage concept is available and serves as the basis for planning. the total costs (kg 200 - 700) according to din 2765 are preliminarily estimated at €5.0 million gross. a detailed description can be found in the tender documents - annex 01. the subject of the procedure is the joint commissioning of architectural services for the object planning of buildings and interiors and for the object planning of outdoor facilities. - two separate contracts will be concluded for the service areas. however, the award will take place within the framework of this specific vgv procedure, so that the award can only be granted to a joint offer. a separate award to different bidders is excluded. - permissible application or offer constellations are: o an architectural firm that provides both service areas, o an architectural firm with a subcontractor for the outdoor facilities planning, o a partnership of architect and outdoor facilities planner (joint liability not necessarily required). object planning of buildings and interiors, according to hoai 2021 part 3, section 1 §§ 34 ff. - stepwise commissioning of the basic services of service phases up to 9, - initially only steps 1 + 2 with lph 2 (remaining services) and 3+4 (completely), including associated special services - further steps according to the contract model according to hav-kom architectural contract - object planning of outdoor facilities, according to hoai 2021, part 3, section 2, §§ 38 ff. - stepwise commissioning of the basic services of service phases 1 to 9, - initially only steps 1 + 2 with lph 1+2 and 3+4 including associated special services - further steps according to the contract model according to hav-kom architectural contract - outdoor facilities special services: - advising the client and participating in funding procedures (step 2; according to ikek / possibly additional, e.g., energy programs) including cost separation according to the specifications of the funding providers - advising the client as well as participating or contributing to the usage proof (step 4; according to ikek / possibly additional, e.g., energy programs) including cost separation according to the specifications of the funding providers - incorporation, review, and evaluation / responsible acceptance of the preliminary planning services according to § 8 hoai - the planning and procurement of the furnishings and equipment including kitchen technology (kg 600) is to be planned and supervised by the architect - the kitchen planning including equipment concept and coordination of the necessary technical connections is part of the object planning. the planning of the technical media connections is carried out in coordination with the technical equipment planners. the commissioning is intended according to the provision of financial and funding resources. there is no legal entitlement to the commissioning, nor to the commissioning of further stages or special services. the essential information can be found in the tender documents stage 1. further information will only be provided to the selected bidders with the invitation in stage 2. note: with the entry into force of the new version of hoai 2021 on 01.01.2021, the binding to minimum and maximum rates has been lifted. the fee tables of hoai 2021 provide orientation values. the fee is based on the agreement made in text form by the contracting parties. the client points out that according to § 7 hoai, a higher or lower fee than the orientation values specified in the fee tables of hoai can be agreed upon. if no agreement has been made, the respective basic fee rate is deemed to be agreed for the basic services. schedule preview: (proposed project timeline) - start immediately after completion of vgv - planning phase - submission of building application / funding application by the end of 2026, at the latest by early 2027 (deadline for funding application submission ikek for construction costs 02/2027; building permit must be available) - construction start from 07/2027 o construction time approx. 2 years o the construction execution takes place in one go o no use of public areas planned during the construction phase - commissioning / start of use: end of 2029 - overall completion end of 2029 estimated value excluding vat: 343298.12 eur.Magistrate of the city of tann, rhönhalle tann - functional expansion through enhancement, conversion, and renovation as well as redesign of the outdoor facilities with playground - architectural services