📋 Tender Overview
Contract Awarded For Kaiping 11-4 Oil Field 18-1 Block Development Project Contains Two Blocks ( 1D Block And 2D Block). The Project Adopts The Development Mode Of Subsea Production System Tying Back To The Newly-Built Cylindrical Fpso. The New-Built Cylindrical Fpso Is Located Between 1D & 2D Block Of Kaiping 11-4 Oilfield 18-1 Block. The Average Water Depth Is About 500M. Two(2) Flexible Risers From Fpso To 1D Subsea Plet. Length Of Both Risers Is Approximately 1.1Km. One(1) Co2 Injection Flexible Riser From Fpso To 1D Subsea Plet. Id Length Is Approximately 1.1Km. Accessories Attached To Three Risers Mentioned Above Including Pull-In Head Assembly, Split Collar And Topside Hang-Off Assembly, Distributed Buoyancy Modules, Ballast Modules, Bend Stiffener, Etc. Kaiping 11-4 Oilfield 18-1 Block Development Project Cnooc China Limited 2025-12-10 09:30 2026-01-30 17:46 - 2026-02-02 23:59 2026-02-04 17:48.Kaiping 11-4 Oil Field 18-1 Block Development Project Contains Two Blocks ( 1D Block And 2D Block). The Project Adopts The Development Mode Of Subsea Production System Tying Back To The Newly-Built Cylindrical Fpso. The New-Built Cylindrical Fpso Is Located Between 1D & 2D Block Of Kaiping 11-4 Oilfield 18-1 Block. The Average Water Depth Is About 500M. Two(2) Flexible Risers From Fpso To 1D Subsea Plet. Length Of Both Risers Is Approximately 1.1Km. One(1) Co2 Injection Flexible Riser From Fpso To 1D Subsea Plet. Id Length Is Approximately 1.1Km. Accessories Attached To Three Risers Mentioned Above Including Pull-In Head Assembly, Split Collar And Topside Hang-Off Assembly, Distributed Buoyancy Modules, Ballast Modules, Bend Stiffener, Etc.