📋 Tender Overview
Contract awarded for Nb hws krottorf (implementation of the flood embankment) environmental construction supervision and object planning for outdoor facilities lot-0000, title: nb hws krottorf (implementation of the flood berm) environmental construction supervision and object planning for open spaces, description: in the section of the bode between witwenstraße (river km 61.350) and bode km 60.600, a profile widening of the watercourse will be created. for this purpose, a flood berm approximately 7.0 m wide and about 807 m long will be constructed on the right bank. the measure serves to improve the hydraulic cross-section as well as to create an operational maintenance path along the watercourse. during the work, earthworks will be carried out to create the flood berm, including the removal and reinstallation of soil material. additionally, an access road will be constructed in the area of witwenstraße, as well as a retaining wall made of concrete precast elements. furthermore, an operational and maintenance path will be established. for the construction execution, a temporary groundwater lowering may be required in the area of the retaining wall. construction period: 27.07.2026 - 28.04.2028 (with winter interruptions) ecological construction supervision is required for these construction services. services during the construction phase: - familiarization with existing documents - construction preparatory services • documenting the current state of the construction buffer areas before the start of construction (photo documentation, description of the current usage state), which must not be used for construction work or only temporarily or otherwise impaired. • indications of necessary avoidance and protection measures according to the landscape maintenance accompanying plan and the approval documents. coordination with the client and the responsible authorities. construction supervision - control of the construction buffer areas during the construction process. - participation in the implementation of avoidance and protection measures (e.g., amphibian fences, buffer areas, tree protection) - continuous coordination with the responsible authorities - participation in the planning of the construction process - participation in the clarification of damage cases that have caused environmental impacts. - if necessary, short-term creation and implementation support of protection and avoidance measures. - protocol creation (site visit and meeting protocols) and independent transmission to the responsible authorities. - documenting the environmentally relevant construction process (notes, photos). - advising the local construction supervision and the construction company on nature conservation and environmental law issues. - advising on the determination of execution methods that avoid or reduce interventions. - irregular control of the construction site and all sensitive areas (at least 2 days/month). - accompanying the capture and relocation of reptiles and amphibians (e.g., sand lizard) - collecting and relocating flora and fauna at the bode bank - participation in consultations and construction consultations on-site (1 day/month). - participation in the acceptance of construction services with environmentally relevant effects, including defect detection and control of defect remediation - documentation/final report services after the construction phase - control of completion and development care including documentation, invoice verification, and monitoring of defect remediation. as a basis for offer calculation, a control activity for a duration of 4 years including all necessary services is to be assumed. object planning for open spaces - service phases 5-9 according to hoai §39, §40 for -- planting of approx. 10 individual trees and -- establishment of approx. 8 willow shrub islands - construction management for open spaces - creation of open space documentation - monitoring of completion and development care including documentation, invoice verification, and monitoring of defect remediation. as a basis for offer calculation, a control activity for a duration of 3 years including all necessary services is to be assumed. estimated value excluding vat: 54607.75 eur.Nb hws krottorf (implementation of the flood embankment) environmental construction supervision and object planning for outdoor facilities