📋 Tender Overview
Contract awarded for Nb hws krottorf - construction of a flood embankment with a wall (implementation of the flood embankment) lot-0000, title: nb hws krottorf - construction of a flood berm with a wall (implementation of the flood berm), description: in the section of the bode between witwenstraße (river km 61.350) and bode km 60.600, a profile widening of the watercourse will be created. for this purpose, a flood berm approximately 7.0 m wide and about 807 m long will be constructed on the right bank. the measure serves to improve the hydraulic cross-section as well as to create an operational maintenance path along the watercourse. during the work, earthworks will be carried out to create the flood berm, including the removal and reinstallation of soil material. additionally, an access road will be constructed in the area of witwenstraße, as well as a retaining wall made of concrete precast elements. furthermore, an operational and maintenance path will be established. for the construction execution, a temporary groundwater lowering may be necessary in the area of the retaining wall. the scope of services of the contractor essentially includes the following services: • construction of a flood berm for the profile widening of the bode between river km 61.350 and km 60.600 with a width of approximately 7 m and a length of approximately 807 m. • construction of a wall between river km 61.275 and 60.850 • execution of the necessary earthworks including the removal of approximately 6,500 m³ of soil and the reinstallation or recycling of approximately 2,500 m³ of suitable soil material. • construction of a construction road with an area of approximately 18,300 m² for site access. • construction of an operational and maintenance path with an area of approximately 12,800 m². • construction of an access road to the flood berm in the area of witwenstraße. • erection of a retaining wall made of concrete precast elements with a length of approximately 85 m. • execution of a temporary groundwater lowering in the area of the retaining wall, as far as necessary for the construction execution. • removal and proper disposal of the stumps present in the construction area in connection with the earthworks (felling work has already been completed). estimated value excluding vat: 1522040.84 eur.Nb hws krottorf - construction of a flood embankment with a wall (implementation of the flood embankment)