📋 Tender Overview
Contract awarded for framework agreement for the supply, installation, and maintenance of fully dynamic parking and traffic guidance signs and accessories and of a central management system mpa wishes to replace the existing parking guidance signs in Antwerp with fully dynamic parking and traffic guidance signs, as well as to provide a number of new signs at new locations. In addition, all these fully dynamic signs must be maintained by the contractor. The contractor is responsible for the realization of a fully operational parking and traffic guidance system. In summary, the assignment consists of the following components (during the basic and extension period of the assignment): - the delivery, installation, and commissioning of fully dynamic parking and traffic guidance signs including accessories (both for the basic system and for future expansions); - the delivery, commissioning, operational maintenance, and keeping up to date of a central management system; - the technical management and (preventive, corrective, and evolutionary) maintenance of the installed parking and traffic guidance signs and of the central management system, both during the warranty period and after the warranty period. The fully dynamic parking and traffic guidance signs will become the property of the contracting authority. The central management system remains the property of the contractor. The contracting authority obtains a right of use or a license for the entire duration of the assignment (both during the basic period and the extension and maintenance period) on this central management system. The assignment is concluded for a period of 4 years (basic period) and is extendable by two times 2 years (extension period). Within the basic period and the extension period, all components of the assignment can be ordered. After the extension period, the contracting authority may decide (without being obliged to do so) to extend the maintenance of the existing parking and traffic guidance system year by year for a maximum of 5 years, with a view to the further maintenance of the existing system (maintenance period). Regardless of the time at which the individual parking and traffic guidance signs were installed or removed (within the basic period and/or within the installation period), maintenance of all installed parking and traffic guidance signs will cease at the same time. The reasons for the duration of the assignment can be found in title 2.5 of the selection guidelines. Value of the result: Winner selection date : Date of conclusion of the contract :18/11/2025 Estimated value excluding VAT :.framework agreement for the supply, installation, and maintenance of fully dynamic parking and traffic guidance signs and accessories and of a central management system