📋 Tender Overview
Contract Awarded For The Flatness Gauge Equipment Includes Laser Measurement And Camera Sets, Calibration Tools, Mounting Frame Assemblies, Cooling Systems And Piping (Water-Cooled Cabinets). Spare Parts Supply Shall Be Guaranteed For An 8-Year Service Period. The Scope Also Covers On-Site Electrical Cabinets (Plc, Pc And Display Screens), Five Sets Of Operation Terminals, Switches And Communication Cables, Cables For Connecting Equipment To Power Supply, Cables For Connecting Equipment To Electrical Cabinets, And Other Necessary Supporting Accessories. Two Brand-Name Laptop Computers Shall Be Supplied As Tools For Flatness Gauge Optimization And Calibration. The Flatness Gauge Shall Be Installed In The Measuring Chamber At The Exit Of The Finishing Mill. Client Terminals Shall Be Arranged One Each At The Finishing Mill Operation Station, Roughing Mill Operation Station, Quality Inspection Station, Finishing Mill Plc Room And Instrument Room. International Tender For Flatness Gauge Equipment And Spare Parts Of "Flatness Gauge Hidden Danger Remediation Project At Rare Earth Plate Mill", Baotou Steel Rare Earth Steel Plate Co., Ltd. Baotou Steel International Economic & Trading Co.,Ltd. 2026-10-20 09:30 2026-10-26 10:21 - 2026-10-30 00:00 2026-11-12 14:27.The Flatness Gauge Equipment Includes Laser Measurement And Camera Sets, Calibration Tools, Mounting Frame Assemblies, Cooling Systems And Piping (Water-Cooled Cabinets). Spare Parts Supply Shall Be Guaranteed For An 8-Year Service Period. The Scope Also Covers On-Site Electrical Cabinets (Plc, Pc And Display Screens), Five Sets Of Operation Terminals, Switches And Communication Cables, Cables For Connecting Equipment To Power Supply, Cables For Connecting Equipment To Electrical Cabinets, And Other Necessary Supporting Accessories. Two Brand-Name Laptop Computers Shall Be Supplied As Tools For Flatness Gauge Optimization And Calibration. The Flatness Gauge Shall Be Installed In The Measuring Chamber At The Exit Of The Finishing Mill. Client Terminals Shall Be Arranged One Each At The Finishing Mill Operation Station, Roughing Mill Operation Station, Quality Inspection Station, Finishing Mill Plc Room And Instrument Room.