📋 Tender Overview
Contract awarded for Extension and renovation of carl-orff primary and secondary school in dießen am ammersee - technical equipment, system groups 4+5, service phases 1-3 and 5-9 according to §§ 53 ff. hoai lot-0001, title: expansion and renovation of carl-orff primary and secondary school in dießen am ammersee - technical equipment, system groups 4+5, service phases 1-3 and 5-9 according to §§ 53 ff. hoai, description: the market dießen am ammersee plans the expansion and renovation of the carl-orff primary and secondary school in dießen am ammersee. the background for the planned measure is currently insufficient space for all-day support in the primary school area. the additional space requirement is to be covered by a new extension building (building f). at the same time, the renewal of the heating center is to take place. as part of a preliminary concept, variants for the expansion were examined, leading to a preferred variant. for functional and economic reasons, an extension building between the existing buildings e and b is therefore sought. with this extension building and the expansion of the attic of building a with 1,380 m² of usable space, a very economical expansion solution is available. in addition to the additional space requirement, the existing building stock (especially building e) also shows significant renovation and modernization needs. this is particularly true in the area of technical systems, regarding fire protection, room acoustics, and lighting. the total investment volume/cost framework for the expansion, expansion, and renovation measures was determined in the preliminary concept to be approximately €19.3 million gross (kgr. 200-700, din 276). this includes approximately €1.0 million gross for the costs of cost groups 440+450, din 276. the milestones for the implementation of the project currently foresee: - planning/service start: mid-october 2026, - start of construction 1st ba = new extension building f, expansion attic building a: spring 2028, - completion 1st ba = new extension building f and expansion attic building a: start of the school year 2029/30 (= mid-september 2029), - start of construction 2nd ba = renovation and expansion building e: summer vacation 2029 (= august 2029), - completion 2nd ba = renovation and expansion building e: end of 2030. whether the renewal of the heating center will be structurally advanced or implemented as part of the 1st construction phase has not yet been finally determined and depends on the planning concept to be developed in this regard. it is intended to commission the following services (in stages) with this tender: technical equipment, system groups 4+5, service phases 1-3 and 5-9 according to §§ 53 ff. hoai. initially, service phases 1 to 2 will be commissioned according to § 55 hoai. there is no legal entitlement to commission further services, optional objects, or further service phases. estimated value excluding vat: none .Extension and renovation of carl-orff primary and secondary school in dießen am ammersee - technical equipment, system groups 4+5, service phases 1-3 and 5-9 according to §§ 53 ff. hoai