Awarded Expansion Existing Tender

🏛️ Coal Mining Museum In Zabrze
📄 Tender ID: 12584585 📅 Published: 18 Feb 2026

📋 Tender Overview

Contract awarded for expansion of the existing suspended railway route with reconstruction of the supporting structure of the railway Description of the subject of the order 1. Name of the order: expansion of the existing suspended railway route with reconstruction of the supporting structure of the railway. 2. The subject of the proceedings is an investment task consisting of the reconstruction of the existing supporting structure for the suspended railway, located on the premises of the mining plant of the 'Guido' mine in Zabrze in the area of the 'Carnall' shaft of the Queen Louise tunnel. 3. The scope of the investment task includes: stage I. reconstruction of the load-bearing structure stage II. extension of the platform walkway at the surface stage III. extension of the platform walkway and route in the tunnel the contractor will execute the scope covered by stage III within (according to the conditions) days from the date of calling the contractor to undertake the tasks (according to the contractor's offer). Due to the necessity of carrying out prior mining works to make the work front of stage III available, the contracting authority assumes that the relevant works will be able to start no earlier than in January 2026. stage IV. installation of the structure of the shelter for the heat pump the scope of the designed reconstruction does not change the way the existing facility is used. 3.1. The existing building structure subject to the designed reconstruction is used as a load-bearing structure for the suspended transport railway with a self-propelled trolley in the form of an overpass. In addition, this facility has been equipped with platforms along with infrastructure in the form of stairs, ramps for people with disabilities, and railings. The designed expansion aims to increase the length of passenger platforms, and thus the length of the track due to the planned change in the composition of the railway fleet, consisting of using an additional passenger car. The designed shelter for the heat pump installations will be separated by means of lattice partitions, which are intended only to secure the devices and installations of the heat pumps from free access by third parties and at the same time to provide visual protection, made in accordance with the recommendations of the conservator of monuments. Therefore, this shelter should be treated as an additional roofing of the expanded load-bearing structure of the overpass. Along with the remaining scope of the designed investment task, the reconstruction does not change the current way of using the building structure. 3.2. The extension of the platform walkway of the passenger station, located in the basin in the area of the Carnall shaft, will consist of executing a similar steel structure to the existing platform. For this purpose, the following structural elements are planned: - execution of the foundation; - execution and installation of an additional load-bearing structure of the walkway; - execution and installation of an additional railing; - extension of the guide for passenger trolleys; as a foundation, reinforced concrete footing has been designed, placed directly on the ground. As the load-bearing structure of the platform walkway, a steel frame has been designed, equipped with brackets for mounting the trolley guides. The walkway of the platform has been designed as a welded platform grid with a height of the load-bearing flat bar of 4 cm. The protective railings of the platform have been designed as steel with shapes and dimensions similar to the existing railings of the platform. 3.3. The extension of the platform walkway of the passenger station in the southern tunnel GKS (main key hereditary tunnel) at a level of -40 m has been designed as a direct anchoring to the ground using chemically bonded anchors. In addition, the platform walkway grids should be equipped with curbs ('bortnice') on the side of the excavation with a height of 15 cm. The equipment of the platform walkway with protective railings in this case is unnecessary. The project provides for the extension of the existing platform walkway by 6.0 m. In addition, the length of this extension can also be shaped freely, taking into account the following limitations: - the spacing of supports in the longitudinal direction should not exceed 1.90 m; - the total length of a single segment of the walkway should not exceed 12.00 m. The scope of the design development does not include necessary mining works related to the possible shaping of the tunnel lining. 3.4. Characteristic parameters of the investment task. Sizes of the designed reconstruction a) extension of the overpass - building area - 23.3 m2, b) shelter for heat pumps - building area - 21.1 m2 - usable area - 15.6 m2, c) extension of the platform walkway at the surface - usable area - 9.9 m2, d) extension of the platform walkway in the tunnel - usable area - 9.0 m2. e) extension of the track along with the busbar at the SO-1 stations (area - 6m) and SO-2 (level -40m - 6m) for the operation of the suspended cog railway of the electrohydraulic type KEH-30 along with its lighting. 4. A detailed description of the material scope of the subject of the order is included in Annex No. 2 to the SWZ: place of work: - surface works for the SO-1 station and installation of the shelter structure will be carried out in the basin near the 'Carnall' shaft - Zabrze, ul. Wolnosci 408 on the premises of plot No. 247801_1.0011.ar_2.4375/64 - underground works - at the passenger station in the southern tunnel of the main key hereditary tunnel at level -40m the distance between both facilities is approx. 150m. Value of the result: Winner selection date : 19/11/2025 Date of conclusion of the contract :02/12/2025 Offizielle Bezeichnung: GÓRBUD Sp. z o.o. Größe des Wirtschaftsteilnehmers: Mittleres Unternehmen Registrierungsnummer: 6351845453 Stadt: Mikolów Postleitzahl: 43-190 Mikolów Land, Gliederung (NUTS): Tyski (PL22C) Land: Polen Rollen dieser Organisation: , Offizielle Bezeichnung: Mikolowskie Przedsiebiorstwo Robót Górniczych i Budowlanych “Górbud” sp. z o.o. Größe des Wirtschaftsteilnehmers: Mittleres Unternehmen Registrierungsnummer: 6351749206 Postanschrift: ul. Podleska 72 Stadt: Mikolów Postleitzahl: 43-190 Land, Gliederung (NUTS): Tyski (PL22C) Land: Polen, Offizielle Bezeichnung: Przedsiebiorstwo Robót Specjalistycznych Geo Serwis sp. z o.o., Podleska 72, 43-190 Mikolów Größe des Wirtschaftsteilnehmers: Kleines Unternehmen Registrierungsnummer: 6351850862 Postanschrift: ul. Podleska 72 Stadt: Mikolów Postleitzahl: 43-190 Land, Gliederung (NUTS): Tyski (PL22C) Land: PolenLOT-0001:Title: expansion of the existing suspended railway route with reconstruction of the supporting structure of the railway LOT-0001:Description: subject of the order 1. name of the order: expansion of the existing route of the suspended cable car with reconstruction of the supporting structure of the cable car. 2. the subject of the proceedings is an investment task consisting of the reconstruction of the existing supporting structure for the suspended cable car, located on the premises of the mining plant of the 'Guido' mine in Zabrze in the area of the 'Carnall' shaft of the Queen Louise shaft. 3. the scope of the investment task includes: stage I. reconstruction of the load-bearing structure stage II. extension of the platform on the surface stage III. extension of the platform and route in the shaft the contractor will perform the scope covered by stage III within (according to the conditions) days from the date of calling the contractor to undertake the tasks (according to the contractor's offer). due to the necessity of carrying out prior mining works to make the work front of stage III available, the contracting authority assumes that the relevant works will be able to start no earlier than in January 2026. stage IV. construction of a shelter structure for the heat pump the scope of the designed reconstruction does not change the way the existing facility is used. 3.1. the existing building structure subject to the designed reconstruction is used as a load-bearing structure for the suspended transport cable car with a self-propelled cart in the form of an overpass. in addition, this facility has been equipped with platforms along with infrastructure in the form of stairs, ramps for people with disabilities, and railings. the designed expansion aims to increase the length of passenger platforms, and thus the length of the track due to the planned change in the composition of the cable car fleet, consisting of using an additional passenger car. the designed shelter for the heat pump installations will be separated by means of lattice partitions, which are intended only to secure the devices and installations of the heat pumps from free access by third parties and at the same time to provide visual protection, made in accordance with the recommendations of the conservator of monuments. therefore, this shelter should be treated as an additional roofing of the expanded load-bearing structure of the overpass. along with the remaining scope of the designed investment task, the reconstruction does not change the current way of using the building structure. 3.2. the extension of the platform of the passenger station, located in the basin in the area of the Carnall shaft, will consist of making a similar steel structure to the existing platform. for this purpose, the following structural elements are planned: - execution of the foundation; - execution and assembly of an additional load-bearing structure of the platform; - execution and assembly of an additional railing; - extension of the guide for passenger carts; as a foundation, reinforced concrete foundation pads have been designed, placed directly on the ground. as the load-bearing structure of the platform, a steel frame has been designed, equipped with brackets for mounting the guides for the carts. the platform walkway has been designed as a welded grating with a height of the load-bearing flat bar of 4 cm. protective railings of the platform have been designed as steel with shapes and dimensions similar to the existing railings of the platform. 3.3. the extension of the platform of the passenger station in the southern shaft of GKS (main key hereditary shaft) at the level of -40 m has been designed as a direct anchoring to the ground using chemically bonded anchors. in addition, the grating of the walkway must be equipped with curbs ('bortnice') on the side of the excavation wall with a height of 15 cm. equipping the platform with protective railings in this case is unnecessary. the project provides for the extension of the existing platform by 6.0 m. moreover, the length of this extension can also be shaped freely, taking into account the following limitations: - the spacing of supports in the longitudinal direction should not exceed 1.90 m; - the total length of a single segment of the platform should not exceed 12.00 m. the scope of the design development does not include necessary mining works related to the possible shaping of the shaft lining. 3.4. characteristic parameters of the investment task. sizes of the designed reconstruction a) extension of the overpass - building area - 23.3 m2, b) shelter for heat pumps - building area - 21.1 m2 - usable area - 15.6 m2, c) extension of the platform on the surface - usable area - 9.9 m2, d) extension of the platform in the shaft - usable area - 9.0 m2. e) extension of the track along with the busbar at the SO-1 stations (area - 6m) and SO-2 (level -40m - 6m) for the operation of the suspended cog railway of the electrohydraulic type KEH-30 along with its lighting. 4. a detailed description of the material scope of the subject of the order is included in Annex No. 2 to the SWZ: place of work: - surface works for the SO-1 station and the construction of the shelter structure will be carried out in the basin near the 'Carnall' shaft - Zabrze, ul. Wolnosci 408 on the premises of plot No. 247801_1.0011.ar_2.4375/64 - underground works - at the passenger station in the southern shaft of the main key hereditary shaft at the level of -40m the distance between both facilities is about 150m. .expansion of the existing suspended railway route with reconstruction of the supporting structure of the railway

🔍 Key Information

📄
Tender Reference No.
12584585
📅
Publication Date
18 Feb 2026
💰
Estimated Value
N/A
🌐
Sector
N/A
📅
Deadline
18 Feb 2026
📝
Notice Type
Contract Awards
📍
Location
Poland
📑
Contract Duration
0 Day

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 18 Feb 2026
🔔 Set Alert

🧭 Quick Facts

Authority Coal Mining Museum In Zabrze
Country Poland
State / UT N/A
Tender Type Contract Awards
Currency N/A
Similar Tenders
Loading similar tenders…