📋 Tender Overview
Contract awarded for Acquisition execution of works for the investment objective 'rehabilitation, modernization, consolidation, and equipping of the 'vasile carlova' gymnasium school in târgovi?te, dâmbovi?a county', smis 328130 - pmt-2026-p-12, unique identification code procedure: 4279944–2026-35 lot-0000, title: default lot, description: the main proposed works are: structural: - locally, the repair of cracks in all interior and exterior walls will be carried out by injecting cementitious or epoxy mortars. for surface repairs of concrete elements, repair mortar based on cement will be used (e.g., sika monotop 612 or similar), and for crack repairs, a two-component epoxy resin will be used (e.g., sikadur-52 injection or similar); - the wall cladding at all levels on both sides with 7 cm of m100t mortar and ø8/150/150 mm mesh of the central longitudinal walls; - the wall cladding at all levels on both sides with 7 cm of m100t mortar and ø8/150/150 mm mesh of the interior transverse walls; - the wall cladding at all levels on the inner face with 7 cm of m100t mortar and ø8/150/150 mm mesh of the perimeter walls; - the wall cladding at the basement level of the perimeter walls on the inner face, with 10 cm of m100t mortar and ø8/150/150 mesh; - the cladding will start from new foundations, with a minimum width of 30 cm and a depth equal to that of the foundations under the walls. to ensure cooperation between the cladding and the support, it is necessary to clean the support from the old plaster, removing 1-2 mm from the surface of the bricks by chiseling. after these stages, air blowing is performed, the reinforcement is installed, the walls are moistened, and then the concrete layer is applied; - the basement wall where the access door to the heating plant is made will be clad both inside and outside. a 30 cm reinforced concrete wall will be built, which will border the newly created access stairs to the basement, to support the newly created vertical earth slope. at the intersection with the masonry wall in the basement, a 30x20 cm reinforced concrete core will be created, from which the reinforced concrete wall will start. the newly introduced stairs will be made of reinforced concrete, with a ramp thickness of 15 cm; - between axes 13-17/a-d, the existing roof will be dismantled and rebuilt while maintaining its shape and dimensions, using metal elements. architectural: - thermal insulation of the exterior walls with an exterior compact thermal insulation system etics with facade basalt mineral wool boards, 15 cm thick; - thermal insulation of the plinth, respectively above-ground basement walls with fireproof extruded polystyrene boards minimum xps300, 12-15 cm thick; - thermal insulation of the ceiling under the attic with mineral wool 25 cm; - repair of cracks in interior and exterior walls; - restoration of interior and exterior finishes; - restoration of the roof according to isu requirements; - restoration of exterior access ramps; - thermal insulation of the walls and restoration of finishes and thermal insulation of the ceiling under the attic and the plinth; - complete replacement of the existing joinery with energy-efficient joinery, with al/pvc frames and - glazing with 3 sheets of low-e glass, including local repairs and interior finishes. installations: - replacement/cleaning (as applicable) of heating bodies and equipping them with thermostatic valves, return adjustment valves, air vent valves; - replacement of hot water pipes for heating and domestic hot water and thermal insulation of the distribution network in unheated spaces; - installation of intelligent automation and control systems, connected to the internet (bms), with the possibility of real-time adjustment of the operating parameters of the building systems, depending on the indoor and outdoor climate conditions (t, rh, co2) and the operating schedule; - installation of alternative energy production systems from renewable sources - photovoltaic panels 108 photovoltaic panels (9 assemblies of 12 panels each) on the roof facing south, which will produce approximately 12 kwp; - replacement of lighting fixtures with modern ones, with fixtures equipped with led sources; - use of artificial lighting sources of the led type; - the need to restore the electrical installation where it is damaged; - use of presence sensors for circulation spaces; - use of individual mechanical ventilation systems with heat recovery. estimated value excluding vat: 8772720.16 ron.Acquisition execution of works for the investment objective 'rehabilitation, modernization, consolidation, and equipping of the 'vasile carlova' gymnasium school in târgovi?te, dâmbovi?a county', smis 328130 - pmt-2026-p-12, unique identification code procedure: 4279944–2026-35