📋 Tender Overview
Contract awarded for The execution of construction and rehabilitation works for three reinforced concrete bridges, related to the following investment objectives: lot 1 dj 205e, over the ?u?i?a river, câmpuri commune, km 64+950, l=144m, vrancea county, lot 2 dj 204b, over the râmnicu sarat river, tataranu commune, km 19+250, l=121m, vrancea county, lot 3 dj 205b, over the ?u?i?a river, satu nou locality, panciu city, vrancea county. { "detected_language": "romanian", "translated_text": "lot-0001, title: execution of rehabilitation works for the reinforced concrete bridge on dj 205e, over the ?u?i?a river, câmpuri commune, km 64+950, l=144m, vrancea county, description: at the reinforced concrete bridge on dj 205e, over the ?u?i?a river, câmpuri commune, km 64+950, l=144m, vrancea county, the following categories of works will be executed: a-bridge works the existing bridge will undergo rehabilitation works, by replacing the existing superstructure and installing prefabricated pre-stressed beams with a length of 18.00 m. the number of openings will remain the same, namely 8, the width of the roadway will be 7.80m, and the total width of the bridge will be 11.40 m. other constructive elements include neoprene bearing devices, infrastructure consisting of 2 abutments and 7 reinforced concrete piers, indirect foundations on bored piles, asphalt concrete pavement on the bridge, conical quarter sections at the connections with the embankments, sidewalk widths of 2x1.55m, safety barriers h4b, total length of the bridge 152.45m. the main intervention works: a) preparatory works; b) infrastructure works; c) superstructure works; d) access ramp works; e) works on the bridge deck; f) traffic safety works, markings, and road signs; b – hydraulic works hydraulic works the riverbed will be cleared of vegetation and debris on two lengths of the bridge upstream and one length downstream. the bank protection will be executed with gabion retaining walls with a height of 3.00 m according to the execution details. the gabion walls will be executed on the following lengths: upstream right bank 85 ml, upstream left bank 55 ml, downstream right bank 25 ml, downstream left bank 35 ml. the gabion walls will be placed on a foundation of plain concrete class c25/30, and around the piers, a protection of riprap will be executed. when installing the riprap around the foundations, a hydrodynamic shape will be considered. the riprap protection will also be realized in front of the gabion walls according to the execution details lot-0003, title: execution of rehabilitation works for the reinforced concrete bridge on dj 204b, over the râmnicu sarat river, tataranu commune, km 19+250, l=121m, vrancea county, description: at the reinforced concrete bridge on dj 204b, over the râmnicu sarat river, tataranu commune, km 19+250, l=121m, the following categories of works will be executed: a bridge works the existing bridge will undergo rehabilitation works, aiming to ensure a proper clearance, by reconstructing the sidewalk cantilevers, restoring a reinforced slope concrete, strengthening the main beams with composite materials and local repairs with special mortars, restoring the geometric shapes of the infrastructures. other constructive elements include 4 openings x 30.00 ml, the width of the roadway of 7.80 m, the total width of the bridge of 11.40 ml, neoprene bearing devices, infrastructure consisting of 2 abutments and 3 reinforced concrete piers, foundations on caissons, asphalt concrete pavement on the bridge, conical quarter sections at the connections with the embankments, sidewalk widths of 2x1.55m, safety barriers h4b, total length of the bridge 152.45m. the main intervention works: a) preparatory works; b) infrastructure works; c) superstructure works; d) access ramp works; e) works on the bridge deck; f) traffic safety works, markings, and road signs; b hydraulic works the riverbed will be cleared of vegetation and debris on two lengths of the bridge upstream and one length downstream. the riverbed will be excavated to ensure the drainage of extraordinary waters. the riverbed will be excavated over a length of 250 m upstream and downstream, measured from the bridge axis. both upstream and downstream, bank protection works with gabions with an elevation of 3 m faced with concrete c30/37 – 10+5cm, on a gabion mattress 50x500x500 are proposed. the bank protections will be executed on the following lengths: upstream right bank 80 ml, upstream left bank 100 ml, downstream right bank 100 m, downstream left bank 90 m. the bank protections will be embedded in the banks for at least 2 m. in front of the gabion mattress, a blockage of riprap weighing 51-100 kg/piece will be arranged. behind the wall, under the mattress and the riprap blockage, a geotextile will be placed as an inverse filter. lot-0004, title: execution of construction works for a reinforced concrete bridge for the investment objective: lot 3 dj 205b, over the ?u?i?a river, satu nou locality, panciu city, vrancea county, l = 155.00 m, km 49+870”, vrancea county, description: at the bridge over the ?u?i?a river, satu nou locality, panciu city, vrancea county, l = 155.00 m, km 49+870”, vrancea county, the following categories of works will be executed: a bridge works the existing bridge will undergo rehabilitation works, by replacing the existing superstructure and installing prefabricated pre-stressed beams with a length of 18 m. the number of openings will remain the same, namely 8, estimated value excluding vat: 19876139.30 ron.The execution of construction and rehabilitation works for three reinforced concrete bridges, related to the following investment objectives: lot 1 dj 205e, over the ?u?i?a river, câmpuri commune, km 64+950, l=144m, vrancea county, lot 2 dj 204b, over the râmnicu sarat river, tataranu commune, km 19+250, l=121m, vrancea county, lot 3 dj 205b, over the ?u?i?a river, satu nou locality, panciu city, vrancea county.