📋 Tender Overview
Contract Awarded for Engineering structures_ara niederrad_gw 110 - special deep construction (approximately 65,000 m³ of earth excavation up to about 11 m below ground level) - retaining structures (sheet pile wall + overlapping bored pile wall - each with: back anchoring, dsv sealing base, and dsv underpinning) + closed water management - 10 reinforced concrete basins in 2 construction areas including integration into existing structures - new construction and restoration of operational roads - preparatory measures: relocation of (including wastewater, water, electrical) lines Date of conclusion of the contract :20/08/2026 Estimated value excluding VAT : .Engineering structures_ara niederrad_gw 110