📋 Tender Overview
Contract awarded for Energy-efficient renovation of the visitor mine and museum in kleinenbremen - indoor air technology lot-0001, title: energy renovation of the visitor mine and museum kleinenbremen - indoor air technology, description: the district of minden-lübbecke will renovate and energetically refurbish the visitor mine and museum kleinenbremen (bbmk) to bring the facility up to current technical standards. the "visitor mine and museum kleinenbremen" (bbmk) is the only authentically preserved iron ore mine and museum in the region of westphalia. the buildings on the property were constructed between 1935 and 1938 and reflect the architecture and industrial style of that time. the mining operation itself was active until 1957 and thus played a significant role in the regional economy and culture. today, interested parties can not only visit the historical sites but also learn more about the techniques and challenges of mining. the bbmk is therefore an important place for education and remembrance of mining history in westphalia. due to its listing in the monument protection register (no. 0175), all building parts are subject to ensemble monument protection, which includes both the external and internal design. since 1988, the property has been used as a museum with an attached workshop as well as storage and exhibition areas. a pollutant report has been prepared. this must be taken into account and observed during the work. the renovation measure includes preliminary demolition, gutting, and dismantling work in the overall three-story building. the services of this tender include all necessary work for the trade of heating supply systems. when disposing of construction debris, the transport routes from the construction site to the disposal entrances and exits must be considered. work and storage areas: outdoor areas are designated for work and storage, as well as areas for the construction site setup. parking spaces: a large visitor parking lot is adjacent to the museum, part of which will be reserved for construction vehicles. construction electricity: construction power supply will be provided externally by the client through a specialized company. after the completion of all work, the entire renovation area must be left clean. all areas necessary for the direct construction site must be prepared by the contractor at their own expense. the areas must be coordinated with the client and the construction management and left clean after the work is completed. rough quantities for publication: 1 piece of ventilation unit with heat recovery 7,200 m³/h 1 piece of ventilation unit with heat recovery 4,400 m³/h 430 m² ventilation duct including insulation work 220 running meters of spiral duct dn 100 to dn 315 48 pieces of air outlets and ventilation valves 14 pieces of fire protection dampers 23 pieces of volume flow controllers (variable and constant) estimated value excluding vat: 187433.20 eur.Energy-efficient renovation of the visitor mine and museum in kleinenbremen - indoor air technology