📋 Tender Overview
Contract awarded for 2026-60_enb_tb_oesede_sigeko_ex-post lot-0001, title: 2026-60_enb_tb_oesede_sigeko_ex-post, description: the following performance images are the subject of the project and must be integrated regarding safety and health protection: object planning engineering structures in connection with the recalculation and strengthening of the bridges on federal highways, the oesede valley bridge was recalculated. as a result, it turned out that it has significant computational proof deficits and does not reach the required target load level. due to its age, the valley bridge only has limited load-bearing capacity and no longer meets contemporary requirements for bridge structures. furthermore, the joints resulting from the sectional construction of a prestressed concrete structure do not have sufficient durability. as a result, several traffic measures have already been taken. during the planning phase, it was determined that further use of the substructures is not reasonably possible from a technical and economic point of view. therefore, a complete replacement of this valley bridge is planned. due to the very important traffic connection for motor vehicle traffic, the replacement construction will largely take place under ongoing traffic, and construction-related closures will be minimized. to maintain traffic over extended periods during the construction project, the planned 6-field bridge will be constructed sequentially with two superstructures. before the first superstructure is used in its final position, it will already be used in a lateral position with two-lane traffic guidance. this requires an interim construction of the b 51 with guidance over the temporary bridge or the first superstructure. interim construction: for the use of the first superstructure as a temporary roadway, the roadway of the federal highway 51 shifts with a deviation length of about 135 m to the western side of the existing bridge structure. the cross-section provides for a 7.75 m wide roadway. due to the limited adjacent areas available, no slope can be considered for the temporary roadway. the height catch is done using a retaining wall. this avoids intervention in the oeseder bach. due to the location of the bridge piers of the temporary bridge, the oeseder straße located there must be temporarily narrowed in cross-section. a two-way roadway cannot be maintained. the roadway will be merged into a single lane, and traffic will be regulated using (construction site) traffic lights. final construction: coming from the junction (b 51, l 95) in the south, the federal highway runs northward with a radius of r = 1,550 m. immediately before the bridge structure, the route continues straight and connects back to the existing expansion with a radius of r = 90,000 m. the length of the measure is about 550 m, with the bridge structure having a total support width of approximately 185 m. the existing one-part bridge structure has a cross-section width of about 17.50 m and will be constructed in two parts with a new cross-section rq 21b as part of the new construction. the cross-section of the roadway will be correspondingly widened. the deviation length is about 150 m. the roadway has a one-sided slope at the beginning of the construction section and switches to a roof profile before the bridge structure, which continues until the end of construction. several construction site accesses must be established and maintained for the construction of the bridge structure. the accesses will be from oeseder straße. the accesses have been proven using dynamic drag curve calculations. the truck/semi-trailer was chosen as the assessment vehicle. access is given. for the bus company, connected to oeseder straße, a new permanent access will be constructed further south. the drainage of the bridge structure is done via outlets, which collect the surface water through longitudinal and fall pipes and transport it to the new rainwater retention basin (which will be constructed in advance and is not part of this tender). the surface water will be discharged into the düte from there. a pre-treatment is done through a transfer shaft with sand trap and diving wall as well as a sedimentation facility. the roadway of b 51 drains over the slope (embankment position) into the existing roadside ditches. the southwest roadside ditch is simultaneously designated as the watercourse oeseder bach (no. 3622). there will be no intervention in the stream. dimensions and data of the existing structure: asb-no. 3714507 year of construction: 1965 type: 2-beam plate girder over 6 springs foundation: deep foundation support width: 27.5 / 30.4 / 30.4 / 30.4 / 30.4 / 27.5 m width: 17 m bridge area: approx. 3002 m² structure angle: 100 gon main construction material of the superstructure: reinforced concrete, prestressed concrete construction condition note 3.4 load index v all other information regarding the existing structure can be found in the attached documents. x specialist planning structural planning see description above x object planning traffic facility see description above x dismantling of engineering structures see description above. estimated value excluding vat: 37338.00 eur.2026-60_enb_tb_oesede_sigeko_ex-post