📋 Tender Overview
Contract awarded for The conversion of the existing data center lot-0001, title: tga conversion existing data center, description: to operate the new high-performance computer hlre-5-, the dkrz plans to adapt computer rooms and the building in several phases until approximately august 2027. the goal of this tender is to appoint a general contractor. this contractor will take over the construction planning and execution. a functional performance specification (flb) serves as the basis for the construction planning. the flb is currently being prepared by a planning office. the general contractor will plan and execute the construction in such a way that the expansion and conversion measures in and around the existing building do not interrupt the data center operation. the project involves the expansion of an existing data center while it is in operation. it concerns approximately 800m² of it usable space in several rooms, various technical systems throughout the building, and the required electrical connection capacity of approximately 4 mw. in particular, the trades of construction, fire protection, cooling, electrical, msr, steel construction, ventilation, as well as interior and exterior construction must be planned and executed in detail based on the existing flb. the construction trade involves different rooms and structures in and around the entire building. fire protection must be ensured during the construction phases and be fully completed upon completion. the heating/cooling supply in the building must meet the described future needs, namely to operate two high-performance computers simultaneously. one of the goals is to consolidate the various cooling circuits into one. all it components and rooms will be cooled according to the description, and the energy absorbed will be channeled out of the building. the electrical supply must be adjusted, which will have implications on every floor of the building. among other things, the assignment includes the establishment of a new e-it supply path, the procurement of a new ups system, a ups backup system, measuring points, and monitoring devices in electrical engineering, raising the lightning protection class from ii to i, supplying both computer systems through the tga, and dismantling unnecessary installations. the control of an msr replaces the current glt and will have more measuring points and data points in the future. this will meet the requirements of iso50001, the required energy efficiency, and the demand for the autonomous controllability of the overall system. the steel construction mainly refers to the dismantling of cooling towers, adapting the roof areas to the described requirements, and installing new cooling towers. the existing intrusion alarm system needs to be replaced. the premises need to be adapted. in the high-performance computer room, areas for software/hardware/storage must be created according to the flb. leak detection needs to be upgraded, and monitoring needs to be supplemented in other rooms. existing ventilation systems must be slightly adjusted. some existing room coolers will be replaced with more powerful units, while others will be modernized. a seminar room (130m²) is to be modernized. this concerns the areas of lighting, ventilation, visualization of presentations, conference technology, room design, and drywall construction. currently, it is planned to equip certain areas of the facade and/or the roof with photovoltaic modules. ongoing calculations of the building's statics will determine the feasibility of implementation. the raised floor of the medium-voltage room (approximately 60m²) needs to be renovated/replaced. the existing fire prevention system needs to be upgraded; if necessary, the operating concept will be adjusted. the client has comprehensive existing plans of his building. these are to be used and updated for handover. the future operation of the it areas and infrastructure facilities will have an energy efficiency that is well below the legal requirements. parts of the building have already been transferred into a bim model as part of previous projects. it is intended that the conversion measures of all relevant trades will also be continued in the bim model as part of this project, including the commissioned options. as part of the flb of the tendering process, the client will specify his client information requirements (aia) as a binding basis for the creation, structuring, and exchange of the bim model. the future contractor must describe his bim implementation model accordingly when submitting the offer. a complete bim modeling of all building parts is currently not planned. the client reserves the right to commission the contractor with the maintenance of tga systems after acceptance of the construction services. the contractor does not have a legal claim to the commissioning of this service. the most important planning results will be made available with the invitation to submit offers. on this basis, bidders can then offer the services to be provided. estimated value excluding vat: -1.00 eur.The conversion of the existing data center