Contract awarded for Contractor shaft-free installation under vkb The project only includes trenchless installation (guided drilling under the railway); other earthworks are carried out by another earthworks contractor. the project concerns the execution of trenchless installation (guided drilling) under the west coast line, between the parking lot along bolmensgatan to the parking lot at marknadsplatsen. the trenchless installation requires a crossing point through the embankment section 630, approximately km151+920. trenchless installation of protective pipes dimension 400 sdr 11 for water pipe dimension 200, including gas filling. trenchless installation of gravity drainage pipe for stormwater dimension 400 sdr 11. Estimated value 4,000,000 sek .Contractor shaft-free installation under vkb