📋 Tender Overview
Contract awarded for construction of renewable energy installations on the premises of GPW S.A. - Suw Bibiela 1. The subject of the order is the design, construction, and commissioning of a photovoltaic installation with a capacity of up to 500 kW, along with connection to the power grid and obtaining the formal legal documentation required by applicable laws, necessary for the commissioning and operation of the installation in question. The installation will be located in the Silesian town, at Woznicka Street 99, on plot no. 1894/2 in the Zyglin district, which is the property of the State Treasury, being in perpetual usufruct of the ordering party. 2. A detailed description of the subject of the order is included in Annex No. 7 to the SWZ - functional and utility program. 3. The order is divided into a design part and an execution part, and the conditions for the execution of the order are detailed in Annex No. 8 to the SWZ - draft provisions of the contract. 4. The task is co-financed under the program: European funds for Silesia 2021-2027 priority FESL.10 "European funds for transformation" action FESL.10.6 "development of distributed energy based on renewable energy sources." 5. In cases where the ordering party refers to standards, technical assessments, technical specifications, and systems of technical references mentioned in Article 101, paragraph 1, point 2 and paragraph 3 of the Act, the ordering party informs that in such cases it allows equivalent solutions described in each such standard, European technical assessment, approval, technical specification, and system of technical references. 6. Employment requirements based on an employment contract - in accordance with Article 95 of the Act: the ordering party requires employment based on an employment contract by the contractor, subcontractor, or further subcontractor of physical construction workers performing the below-mentioned activities necessary for the execution of the order: earthworks, installation of photovoltaic systems, and site development and organization works. 7. Control of the contractor's compliance with the requirements related to the employment of these persons and sanctions for non-compliance with these requirements are detailed in paragraph 4 of the draft provisions of the contract - Annex No. 8 to the SWZ. Value of the result: Winner selection date : 02/01/2026 Date of conclusion of the contract :14/01/2026 Estimated value excluding VAT :.construction of renewable energy installations on the premises of GPW S.A. - Suw Bibiela