📋 Tender Overview
Contract awarded for Construction of a rainwater drainage system in a section with a length of 232 m, from point 122 through points 123, 124, 53, 125 to point 96 according to the regulatory plan of the village of kaloyanovo, plovdiv region. lot-0001, title: construction of rainwater drainage in a section with a length of 232 m, from o.t. 122 through o.t. 123, 124, 53, 125 to o.t. 96 according to the regulatory plan of kaloyanovo village, plovdiv region, description: the repair includes cutting and breaking up the old pavement, delivery and laying of a crushed stone base, delivery and laying of a sand cushion under and around the pipe, delivery, laying, and installation of sewer pipes with diameters of ?1000, ?800, ?400, ?200. the length of the rainwater drainage planned for construction is: executed with pipes ?1000, stiffness class sn8 – 232.00m executed with pipes ?800, stiffness class sn8 – 16.00m executed with pipes ?400, stiffness class sn8 – 12.00m executed with pipes ?200, stiffness class sn8 – 24.00m the sewer network will be constructed from polyethylene pipes, with a load class of sn8. the technological process of laying the rainwater drainage includes: excavating the trench to the specified depth. the pipes should be of standard length 6m. their installation is done with couplings. the pipes are installed on a 10cm sand cushion. backfilling of the pipes up to 25 cm above their crown is done with sand or soft soil. it is mandatory to compact the sand around the pipes to avoid subsequent deformations. subsequent backfilling with ballast to the project road bed level, with the backfilling being done in layers and must be compacted. only pipes that have a certificate from the ministry of health of the republic of bulgaria and a certificate from the committee for standardization and metrology should be used in construction. the full scope of activities included in the subject of the order is detailed in the technical specification, quantity calculations, and project documentation, which are an integral part of the documents for this procedure. estimated value excluding vat: 400840.82 eur.Construction of a rainwater drainage system in a section with a length of 232 m, from point 122 through points 123, 124, 53, 125 to point 96 according to the regulatory plan of the village of kaloyanovo, plovdiv region.