📋 Tender Overview
Contract awarded for Construction of the railway stop 'kraków pradnik czerwony' along with the construction of a park & ride parking lot - order in the design and build formula. lot-0001, title: construction of the ska railway stop "kraków pradnik czerwony" along with the construction of a park & ride parking lot - order in the design and build formula, description: 1. the subject of the order is the preparation of design documentation and construction works consisting of: reconstruction of the tracks of railway line no. 8, construction of 2 external single-edge platforms along railway line no. 8, construction of 2 parking lots in the p+r system as well as kiss+ride spots and taxi stands, construction of sidewalks and pedestrian-bicycle paths, construction of a footbridge for pedestrians and cyclists over railway line no. 95, construction of a vertical communication system in the form of sidewalks, elevators, and fixed stairs connecting the ground level with the platforms, as well as: expansion of reduta street and reconstruction of meiera street, expansion of the road viaduct over railway line no. 95 along reduta street, construction of a road viaduct over railway line no. 8 and construction of accompanying infrastructure. 2. the execution of the subject of the order has been divided into two stages: stage i - includes the preparation of comprehensive design and cost documentation, including in particular: a. executive design of all necessary branches, b. all legally required decisions, permits, agreements, and opinions; c. bill of quantities; d. technical specifications for the execution and acceptance of construction works. 2) stage ii - includes the execution of construction works of the subject of the order, including in particular: a. preparation of the construction site; b. execution of construction and assembly works covered by the design documentation and executive documentation; c. disposal of construction waste in accordance with the waste act; d. conducting tests and inspections of completed construction works; e. conducting the acceptance procedure for construction works; f. obtaining a decision allowing for the use of the investment; g. preparation of as-built documentation; h. tidying up the construction site and handing over the investment to the ordering party. 3. a detailed description of the subject of the order and the scope of the contractor's obligations are specified in the attachments to the swz, including in particular the draft provisions of the agreement (ppu), which is annex no. 1 to the swz and the functional and utility program (pfu) which is annex no. 1 to the ppu. the ordering party provides the functional and utility program along with attachments (technical documentation) in the form of a link. the link is located in annex no. 1 to the ppu. 4. the order is carried out in the design and build formula. the ordering party has the final construction permit decision no. 1/bk/2020, reference: wi-xi.7840.1.71.2020.mt along with the construction project (this documentation constitutes annex no. 2 to the pfu). estimated value excluding vat: 61207670.27 pln.Construction of the railway stop 'kraków pradnik czerwony' along with the construction of a park & ride parking lot - order in the design and build formula.