📋 Tender Overview
Contract awarded for Construction of a multi-family residential building 1d with an underground garage and land development at hallera street in krosno, plot no. 3424/2, krosienko nizne district. lot-0001, title: construction of a multi-family residential building 1d with an underground garage and land development at hallera street in krosno, plot no. 3424/2, district kroscienko nizne, description: the subject of the order in the design and build formula is to carry out design work and construction works, consisting of the construction of a multi-family residential building 1d with an underground garage, along with internal installations and fixed equipment as well as utilities and land development. residential units should be finished "turnkey", i.e.: in a condition allowing habitation without the tenant incurring additional costs related to the finishing of the unit, in particular, they should have: a) wall and ceiling paint finishes, b) floor coverings in all rooms, c) wall coverings in sanitary nodes (full-height ceramic tiles), kitchenettes and kitchens (tile backsplashes), d) internal door joinery, e) four-burner induction cooktops, built-in electric ovens, single-basin sinks with a draining board made of conglomerate and faucets f) bathroom fixtures (sinks, bathtubs/showers, toilet bowls "geberit type", etc.) the subject of the order consists of: • execution based on the architectural and construction project and pzt and building permit of the technical project in the structural industry and technical projects of internal installations enabling obtaining decisions from supervisory authorities for the use of the building (including fire service and sanitary inspection), • execution of technical industry projects assuming the construction of an energy-efficient building to achieve an ep indicator below 30 kwh/(m2 x year) while meeting the conditions regarding energy savings and thermal insulation for wt 2024, • execution of construction works based on already developed projects: architectural and construction, pzt and technical connections and development in the "design and build" formula of technical structural projects and comprehensive internal installation projects (including video surveillance of the facility), • execution of technical connections, • execution based on the pzt project of works related to land development including 61 parking spaces (according to the marked scope of works - appendix 1 to the description of the subject of the order), both the developed documentation and the completed construction works must meet the conditions according to the standards specified in the regulation of the minister of investment and development of march 4, 2019, on standards for spatial shaping of the building and its surroundings, technology of execution and technical equipment of the building and location of projects implemented with the use of financial support from the subsidy fund (journal of laws item 457). in addition, the building must be fully accessible to people with disabilities in accordance with building law. 3. characteristic parameters defining the scope of construction works definition of the existing state of land development. the subject area stretches in a narrow strip between the existing road 2.kdl (hallera street) and the road designed in mzpp 1.kdg.2 at a distance of 60-70 m from the railway track. the area of the plot covered by the development is undeveloped and treeless. the difference in ground levels within the development is approx. 1.3 m. 4. designed land development: a. construction devices related to the facility have been designed: - water supply connection, - heating and hot water connection, - energy connection, - external lighting installation, - telecommunication sewage system, - electric vehicle charging sewage system - sanitary sewage connection, - stormwater sewage connection, - playground, - access roads with parking spaces for passenger cars, - fire access, - sidewalks, - waste bin enclosure, - barrier, - greenery, the planned investment is serviced from gen. józefa hallera street via a designed and executed access road according to a separate procedure with a width of 5 m designed for buildings no. 1a and 1b. 5. summary of areas. a. building area – 1003.00 m2 b. gross volume - 27,350 m3 c. total area - 7360 m2 d. usable area in total - 3625.04 m2 e. usable area of apartments – 3641.79 m2 f. number of apartments - 65 pcs g. building height - 25.46 m h. number of above-ground floors 8 i. number of underground floors 1 estimated value excluding vat: 25399000.00 pln.Construction of a multi-family residential building 1d with an underground garage and land development at hallera street in krosno, plot no. 3424/2, krosienko nizne district.