📋 Tender Overview
Contract awarded for Construction project: future center for german unity and european transformation location riebeckplatz in halle (saale) specialist planning technical equipment - sbd-2026-0284 lot-0005, title: lot 5 system group 1.1.4 – high voltage systems, description: object description – technical equipment high voltage systems according to the winning design of the architectural competition, a photovoltaic system is to be planned on the roof and facade. the use of an electrical energy storage system to increase the degree of autonomy is to be examined. the photovoltaic systems are an integral part of the building's design. in collaboration with other specialists, it is to be investigated how the safety and, if necessary, backup power supply can be implemented economically. due to the size and use of the building, planning for a customer-owned medium voltage system is to be expected. the development and distribution of high voltage from the grid connection to the consumer is to be planned. in the areas of exhibitions, the archive of transformation, and event halls (large event hall and lecture hall), the connections are to be planned in such a way that variable use of the spaces is possible. lighting for the entire building is to be planned. various requirements must be considered. in the areas of living and office, storage, depots, ancillary rooms, and technical rooms, appropriate technical lighting is to be planned. in the areas of events, exhibitions (except for storage and depots), education, and gastronomy, representative lighting with lighting control is to be planned. additionally, in the exhibitions and the archive of transformation, the lighting is to be planned variably so that it can be adapted to different exhibitions. for the shop, the lighting is to be designed so that it can be adapted to a varying range of products. the lighting may extend to the outdoor areas. in principle, the appearance of the luminaires must be coordinated and determined with the architect at the latest during the design planning. the specifications are to be compiled in a luminaire list with images, essential characteristics, and an assignment in the plans, e.g., through numbering, and included in the fpu. due to the size and use of the building, planning for emergency lighting is to be assumed. a lightning protection and surge protection concept is to be created for the building. based on the results, the lightning protection system and surge protection for the building are to be planned. the supply of the construction site with electrical energy is to be planned. lot-0006, title: lot 6 system group 1.1.5 – telecommunications and information technology systems, description: object description - technical equipment telecommunications or information technology systems (excluding media technology) a service-neutral structured data cabling according to amev lan with the minimum standard cat.7 in the tertiary area is to be planned. a server room of approximately 30m² is to be planned. the active components of the telephone system and data network will be procured by the user. door intercom and opening systems are to be planned for the accesses. a time recording system for employees is to be planned in the building. due to the use and extent of the building, the necessity of a fire alarm and voice alarm system, as well as an object radio system bos, is to be assumed. for the control of the fire alarm system, a fire control matrix is to be created, which shows which technical systems are controlled how and when. depending on the user's security concept, a burglary alarm system may be required. a digital locking system is to be planned, which can also be used for access control. the identification means used should preferably also be usable for other systems, such as priority rides in elevators and the time recording system. in the preliminary planning, the economic viability of online and offline solutions is to be examined. a digital room occupancy system with corresponding door signs is to be planned. coverage with wlan and mobile telephony is also to be planned. in the areas of exhibitions, the archive of transformation, and event halls (large event hall and lecture hall), the connections are to be planned in such a way that variable use of the spaces is possible. the award for planning the media technology (event and presentation technology, etc.) will take place in a separate lot. estimated value excluding vat: 525600.12 eur.Construction project: future center for german unity and european transformation location riebeckplatz in halle (saale) specialist planning technical equipment - sbd-2026-0284