📋 Tender Overview
Contract awarded for Construction creative forum, cleantech innovation park, hallstadt lot-0001, title: ve 013 system partition, description: the new building of cleantech innovation park gmbh is the second construction project on the campus at michelinstraße in hallstadt. the property is easily accessible via the nearby a70 and a73 from the bamberg motorway junction. the building is planned as a four-story structure without a basement in a wood-hybrid construction method including an attached steel structure. maximum building dimensions: - max. building height 16.30m above finished floor level (±0.00 = 247.80 above nhn) - building footprint: 41.65m x 26.65m - gross floor area approx. 3,650m² the contractor's performance includes wood-glass partitions (including doors in the system) with and without fire protection requirements, as well as fall protection: wood-glass partitions ei 60, fall protection: approx. 25 m² wood-glass partitions ei 60: approx. 19 m² wood-glass partitions without fire protection requirements: approx. 400 m² including necessary door technology. estimated value excluding vat: 481756.29 eur.Construction creative forum, cleantech innovation park, hallstadt