📋 Tender Overview
Contract awarded for Contract for the construction of concrete walls to prevent erosion along the main pipe rc0400 kp 27, in front of bv.2, construction of drainage ditch bv.3.3, and work to repair erosion points of the ngr pipe. Credit limit/Amount: 3,471,415.00.Contract for the construction of concrete walls to prevent erosion along the main pipe rc0400 kp 27, in front of bv.2, construction of drainage ditch bv.3.3, and work to repair erosion points of the ngr pipe.