📋 Tender Overview
Contract awarded for Construction of a cafeteria with care rooms at the mönchhof primary school in heidelberg lot-0000, title: new construction of a cafeteria with care rooms at the mönchhof primary school in heidelberg, description: planning services for demolition and building planning in heidelberg negotiation procedure with participation competition - award no. hd_65_2026_002 new construction of a cafeteria with care rooms at the mönchhof primary school in heidelberg the food and care situation at the mönchhof school is to be fundamentally improved by the new construction of a cafeteria and the creation of modern rooms for the care of primary school students. the existing care pavilion, built in the 1960s, has had deficiencies for many years and heats up unbearably in summer, so it is to be demolished and replaced by a new building. the mönchhof school does not have a dining room; currently, students eat decentralized in the care rooms of the pavilion and the basement. the new building is planned as a two-story, non-basement structure. the barrier-free ground floor includes, in addition to the warming kitchen and dining room, an office for the facility management, storage rooms, and the necessary sanitary and building technology rooms. in the outdoor area, there is a waste box and a storage area for outdoor equipment. the upper floor contains a total of 7 care rooms, which are accessed via a corridor running on the south side. due to the north orientation of the care rooms, they are also protected from heating up. the corridor area can also be used for differentiation offers in coordination with the fire protection planner; window niches with benches invite reading, for example. the room equipment includes sufficient storage space, wardrobes, and in every second room a small kitchenette that can be used for educational purposes (healthy nutrition, baking together, etc.). natural materials such as wood-based materials and linoleum floors are proposed for the interior design. energetically, the building is planned in passive house construction; the facades consist of robust fiber concrete panels on the ground floor and a wooden cladding on the upper floor. escape stairs lead to the schoolyard at both ends of the building. the roof will have a green roof and a photovoltaic system, which will be installed by the heidelberg municipal utilities. the building will be connected to the existing building's technical systems and supplied from there. the adjacent outdoor facilities will be restored after the completion of the project, and the existing trees will be protected during the construction period. during the construction period, a single-story container facility will be set up in the schoolyard, which will have four care rooms, as there are no sufficient space reserves in the existing building. the basis for the services to be commissioned is the existing design or approval planning. the project was interrupted at the end of 2024 due to a lack of budgetary funds. before the interruption, the building application was submitted. a building permit is still pending and will be submitted later. in the meantime, the design architect informed us that he could not continue the planning. the other specialist planners have been commissioned and have largely completed lph3. they will receive the follow-up commissioning shortly. gross floor area (bgf): 1,304 m² gross volume (bri): 6,917 m³ usable area (nuf): 907 m² the two-story new building is to be constructed in wood-hybrid construction. the ground floor will be built in reinforced concrete due to the large ceiling spans; the upper floor in timber construction. in the course of political and technical discussions on "simple construction," it was examined to forgo comprehensive ventilation technology. after coordination with the planning participants, it was decided to continue to provide ventilation systems at least for the cafeteria kitchen, toilets, and interior rooms. the kitchen and staff toilet will have a central ventilation system with heat recovery, while the sanitary areas will have separate ventilation. the cafeteria and care rooms will primarily be ventilated through windows. the building will be connected to drinking water, district heating, and control technology of the existing building. the basic services for building planning are tendered according to hoai §34 annex 10 number 10.1 with service phases 5-9, classified in fee zones iv, as well as the demolition planning based on hoai §34 with service phases 1-3 and 5-8, classified in fee zone iii. (some basic services are omitted - this is indicated in the price sheet). the dwg files will be provided in 2d. the cost framework for the project amounts to approximately 6 million eur gross (kg 300+400). planning services are to begin no later than september 2026. the first tender package must be sent out in february 2027. estimated value excluding vat: 458000.00 eur.Construction of a cafeteria with care rooms at the mönchhof primary school in heidelberg