📋 Tender Overview
Contract awarded for Conservation and maintenance of the stormwater drainage network in the municipality of the city of tychy in the year 2025 - repetition of similar services ii lot-0001, title: conservation and maintenance of the stormwater drainage network in the municipality of the city of tychy in 2025 – repetition of similar services ii, description: the nature of the ordered work will require: - cleaning of stormwater drainage along with manholes, cutting tree roots from stormwater drainage, cleaning and maintenance of sand traps, cleaning of settling tanks, cleaning of oil separators; - replacement of stormwater drainage, renovation of stormwater drainage using trenchless methods, construction of drainage manholes, repairs of manholes, height adjustment of manholes to the ground level, restoration of surfaces, supplementation or replacement of concrete or cast iron covers on manholes; - inspections of drainage devices and evaporating tanks, operational inspections of pre-treatment devices; - sealing of illegal connections to stormwater drainage, smoke testing of the stormwater drainage network, tv monitoring of the stormwater drainage network, visual assessment of drainage manholes regarding connections, locating buried or asphalted drainage manholes in the field; - installation of backflow valves at stormwater drainage outlets; - geodetic inventory with mapping of sections of stormwater drainage along with manholes (in the case of replacement of sections of stormwater drainage or identification of unrecorded sections of stormwater drainage, manholes, and other devices in the field); - maintaining stormwater pumping stations and grates on sand traps; - mowing grass in the area of stormwater pumping stations, around sand traps and outlets; - issuing technical opinions. each time before the contractor begins work, the ordering party will specify the detailed scope of work along with its technology and completion date in the work selection protocol. the contractor declares full availability in performing the subject of the contract. as part of this obligation, the contractor is required to ensure 24/7 on-call duty. the contractor undertakes to record and archive all reports received from the ordering party and other entities operating in the city throughout the duration of the contract, particularly from: fire brigade, police, municipal guard, city road and bridge management, and dispatcher of water and sewage companies. in the event of receiving a report of irregularities, failures, or other situations requiring intervention related to the execution of the subject of the contract, the contractor undertakes to take actions aimed at their removal, which means starting appropriate technical or organizational activities, including in particular: preparing equipment, organizing resources necessary for the intervention, issuing orders for departure, and starting to travel to the location indicated in the report – within no longer than 1 hour from the moment of receiving the report. in the description of the subject of the order, the ordering party did not indicate trademarks, patents, or origins, sources, or specific processes that characterize the products or services provided by a specific contractor. estimated value excluding vat: 599386.38 pln.Conservation and maintenance of the stormwater drainage network in the municipality of the city of tychy in the year 2025 - repetition of similar services ii