Awarded Comprehensive Modernization Tender

🏛️ Multispecialty Hospital - Independent Public Health Care Team In Zgorzelec
📄 Tender ID: 13243385 📅 Published: 25 Mar 2026

📋 Tender Overview

Contract awarded for comprehensive modernization and expansion of hospital infrastructure (urology, endoscopy, operating room) - design, execution, and equipping as part of the task entitled: "increasing access to services in the field of oncology diagnosis and treatment in a multi-specialist hospital - SPZOZ in Zgorzelec The numbering is in accordance with the SWZ 3.1. The subject of the order is: "comprehensive modernization and expansion of hospital infrastructure (urology, endoscopy, operating block) – design, execution, and equipment as part of the task entitled: "increasing access to services in the field of oncology diagnostics and treatment in a multi-specialist hospital – SPZOZ in Zgorzelec." 3.2. The detailed scope of work and supplies commissioned to the contractor is defined in Annex No. 7 to the SWZ (descriptions of the subject of the order and functional-utilitarian programs for each stage along with attachments), the draft contract, which constitutes Annex No. 8 to the SWZ, as well as this specification of the terms of the order and its attachments. 3.3. The task is carried out in the "design, execute" formula. 3.6. The contracting authority requires, and the contractor undertakes to employ workers performing directly activities in the scope of: - related to demolition work, - related to general construction work, - related to electrical and telecommunication installations, - related to sanitary networks and installations based on an employment contract within the meaning of the provisions of the Act of June 26, 1974 - Labor Code, taking into account the minimum wage established based on Article 2, paragraphs 3-5 of the Act of October 10, 2002 on the minimum wage for work, throughout the duration of the contract. The same obligation applies to subcontractors and further subcontractors of the contractor. 3.7. The requirements under Article 134, paragraph 2, point 14 of the PZP Act are described in the draft contract – constituting Annex No. 8 to the SWZ. 2.1. The contracting authority does not allow the submission of partial offers. Justification for not dividing the order into parts and applying the "design, build, and equip" formula. i. Legal basis The contracting authority, acting on the basis of Article 91, paragraph 2 of the Act of September 11, 2019 on public procurement (consolidated text: Journal of Laws of 2024, item 1320, as amended), departs from dividing the order into parts. At the same time, in accordance with Article 27, paragraph 1 of the PZP Act, the contracting authority classifies the order as construction works, considering that they constitute the main subject of the order, determining its purpose and functionality. ii. Factual and substantive justification 1. The dominant nature of construction works The essence and primary goal of the investment intention is the construction, expansion, and thorough renovation of hospital infrastructure. It is these actions (creating new volume through superstructure, breaking through ceilings, building staircases, replacing critical installations) that ensure the necessary functional effect, which is the establishment of functional medical departments. The delivery of equipment and furnishings plays a secondarily functional (accessory) role. Medical equipment is merely a complement to the construction substance; without carrying out complicated construction and installation works (e.g., medical gases, ventilation in cleanliness class), the delivered equipment would be useless. Therefore, construction works determine the nature of the order. The investment constitutes an inseparable whole, resulting from the specificity of the hospital's functioning as a "living organism." The buildings covered by the scope of work (a, b, c) are permanently connected by a common, critical technical infrastructure. Medical gas systems, central heating, potable and fire-fighting water (hydrant), sewage, and electrical supply constitute an integrated network, where interference at one point directly affects the safety and continuity of work in other parts of the complex. • Coordination of critical systems: It is necessary to precisely agree on the sequence of shutdowns and power surges of installations so as not to paralyze medical activities and endanger patients' lives. One entity responsible for all works guarantees the consistency of the schedule for media supply interruptions. • Management of internal logistics: Work is carried out while maintaining the full operability of the hospital. This requires integrated management of common communication routes – transporting construction materials, moving teams, and waste removal – in a manner that does not disrupt the transport of patients and medical staff. • Sequencing and relocation: The investment has a cascading nature. For example, the completion of the urology superstructure is an absolute prerequisite for the temporary relocation and then the final expansion of the clinical oncology department. Dividing the order into parts would introduce the risk of lack of coordination between contractors, which in the case of delays at one stage would prevent timely relocation of departments and block the provision of health services. 2. An inseparable technical-organizational whole ("domino effect") The investment is carried out within one hospital complex, where individual buildings (a, b, c) are connected by a network of critical installations. The scope of work at individual locations is closely related – for example, the completion of the urology superstructure is a necessary condition for the relocation and expansion of the clinical oncology department. Dividing the order into parts (e.g., separately for construction, separately for installations) under "working on a living organism" would create the risk of lack of coordination, which would threaten to paralyze the hospital's medical activities. 12.1. The binding offer period is 60 days, i.e., until March 29, 2026. Value of the result: Winner selection date : 09/02/2026 Date of conclusion of the contract :12/02/2026 Estimated value excluding VAT :.comprehensive modernization and expansion of hospital infrastructure (urology, endoscopy, operating room) - design, execution, and equipping as part of the task entitled: "increasing access to services in the field of oncology diagnosis and treatment in a multi-specialist hospital - SPZOZ in Zgorzelec

🔍 Key Information

📄
Tender Reference No.
13243385
📅
Publication Date
25 Mar 2026
💰
Estimated Value
N/A
🌐
Sector
N/A
📅
Deadline
25 Mar 2026
📝
Notice Type
Contract Awards
📍
Location
Poland
📑
Contract Duration
0 Day

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 25 Mar 2026
🔔 Set Alert

🧭 Quick Facts

Authority Multispecialty Hospital - Independent Public Health Care Team In Zgorzelec
Country Poland
State / UT N/A
Tender Type Contract Awards
Currency N/A
Similar Tenders
Loading similar tenders…