📋 Tender Overview
Contract awarded for Bva_elt_utility services waldkirchen_restoration of the karoli swimming park waldkirchen lot-0001, title: bva_elt_city utilities waldkirchen_renovation of the karoli bath park waldkirchen, description: the city utilities waldkirchen, a municipal enterprise of the city of waldkirchen, intends to comprehensively renovate the karoli bath park located at vdk-heim-straße 3 in 94065 waldkirchen. the karoli bath park represents a significant recreational, sports, and health facility in the region and is intensively used by the population as well as by schools, clubs, and guests. the aim of the measure is to ensure the long-term viability of an economical, energy-efficient, and future-proof bathing operation. the overall project is divided into two independent funding measures. the first project phase includes the technical and energy-related renovation of the indoor pool and is funded under the european regional development fund (erdf). the second project phase involves the modernization of the indoor pool area with measures to increase attractiveness and quality of stay and is funded through the guideline for the promotion of public tourist infrastructure (röfe). the two funding measures must be clearly separated financially and in accounting throughout the entire project duration. all planning, awarding, construction, and accounting services must be clearly assigned to the respective funding areas and documented accordingly. this particularly applies to the services of individual contractors, provided that these works are performed for both funding measures. a funding-compliant allocation of costs and services must be ensured throughout the entire project duration. the focus of the overall measure is on the technical and energy-related renewal of the indoor pool. the goal is not a complete reconstruction of the bath park, but the sustainable modernization of the technical infrastructure while largely integrating the existing building structures. the mediterraneum, built in 2006, will fundamentally remain and will be adapted to the renewed technical infrastructure. the restaurant and changing areas should remain as unchanged as possible and only be adjusted as necessary for technical, functional, or legal reasons. the measure includes extensive interventions in the technical building equipment, including water treatment, heat supply, ventilation and air conditioning technology, electrical engineering, measurement, control, and regulation technology, as well as building automation. the focus is on increasing energy efficiency, improving operational safety, and ensuring the long-term viability of economical plant operation. special importance is attached to the renewal of the combined heat and power plant (chp). this is part of the tax-related cross-connection between the karoli bath park, the ice rink, and the electricity sector of the city utilities waldkirchen. the tax-related cross-connection must be maintained without restriction before, during, and after the implementation of the overall measure. all planning and execution decisions must be made in such a way that the conditions for the continued existence of the tax-related cross-connection are guaranteed at all times. a key project goal is the earliest possible resumption of bathing operations. therefore, a construction schedule must be developed during the planning phase that allows for phased commissioning. in particular, the mediterraneum and the outdoor pools technically connected to the indoor pool should be able to be used again as early as possible after the necessary work is completed, even if further construction phases of the overall measure are still ongoing. due to the erdf funding, there are special requirements for scheduling, documentation, and proof of use. the measures of the first funding phase must be fully implemented according to the specifications of the funding provider and accounted for by 2029 at the latest. compliance with all funding-related requirements is a significant framework condition of the overall project. services for the technical planning of electrical equipment (plant groups 4 and 5) will be commissioned in accordance with §§ 53 ff. hoai in service phases 1 to 3 and 5 to 9. the commissioning will take place in stages. in the event of an order, service phases 1 to 2 will be commissioned first. the commissioning of further service phases will be decided by the client according to the progress of the project (staged commissioning). special services will be awarded: - energy certificates and contributions to the energy optimization report according to the requirements of the erdf funding - contribution to the preparation of the necessary documents and calculations for state aid assessments - support in applying for funding (for erdf and röfe) - support in funding accounting including proof of use (for erdf and röfe) - monitoring of defect rectification within the limitation period. estimated value excluding vat: 128651.74 eur.Bva_elt_utility services waldkirchen_restoration of the karoli swimming park waldkirchen