📋 Tender Overview
Contract awarded for Budapest tram network phase ii engineer service lot-0001, title: implementation of the budai converging tram network phase ii, engineer services, description: the project titled "implementation of the budai converging tram network phase ii - construction of the tram line along the muegyetem quay to the mol headquarters, in the kopaszi dam area" will be realized under the management of the contracting authority. the winning bidder's task is to provide independent engineering and technical supervision services. the main technical parameters of the project related to the implementation are: construction of a new double-track tram line 2.8 kilometers long (a total of 5.6 track kilometers), - of which at least 1.2 km (a total of 2.4 track kilometers) will have a grass-covered surface - realization of 7 pairs of new accessible stops, as well as the construction of a new terminal waiting building at the dombóvári road junction. the environmental arrangement of the upper quay section and the dombóvári road up to budafoki road (approximately depending on the trunk circumference, planting of 394 trees, 27,431 shrubs, which may be modified based on the reviewed tree cutting and replacement plan), as well as the construction of a continuous quay promenade and cycling infrastructure (2660 m) between szent gellért square and rákóczi bridge. related to the investment, the necessary overhead line will be constructed over a length of 2850 m (installation of a new working line of 6484 m), conversion and construction of the power return, bkv direct current network, reconstruction of street lighting, and relocation of utilities. the affected utilities (new pipeline constructions): - drinking water pipeline (3,808 m, of which at least 1,106 m has an internal diameter of at least 700) - sewage pipeline (4,778 m) - telecommunications lines (11 service providers involved) - electrical line (32,886 m) - gas pipeline (1,756 m) the detailed quantities and tasks are included in the procurement documents. the engineering services to be performed under this contract include, among others, the following sub-activities: - performing technical supervision tasks according to § 70 (5) of the construction act and § 16 (1)-(5) of government decree 191/2009 (ix. 15.) on construction activities, - reviewing and approving plans prepared by the contractor or proposing approval, as well as actively coordinating the successful acquisition of necessary certifications, with the support of participating actors, and qualifying the documents generated during the project. - reviewing contractor claims, - monitoring physical and financial progress, reviewing and approving contractor schedules, - preparing regular reports for the contracting authority, - evaluating potentially unique technical solutions arising during the project from a technical-feasibility perspective. the tasks to be performed by the winning bidder during the warranty period of the contract include, among others: - checking the fulfillment of the contractor's warranty obligations, - convening a meeting to initiate the warranty, - proposing resolution or enforcement of the warranty guarantee in case of violation of the contractor's warranty obligations, - convening and conducting post-review procedures, - preparing closing minutes and drafting the warranty certificate upon expiration of the warranty period. the detailed quantities and tasks are included in the procurement documents. estimated value excluding vat: 205000000.00 huf.Budapest tram network phase ii engineer service