📋 Tender Overview
Contract awarded for U-bahn farmsen, construction section 1, road construction (lot 1) lot-0001, title: u-bahn farmsen, construction lot 1, road construction (lot 1), description: the area of the farmsen subway station with the junctions august-krogmann-straße/am luisenhof and august-krogmann-straße/berner heerweg/rahlstedter weg, whose basic renovation and redesign is being tendered here, forms the central junction of the metrobus line 26 (mb26). in addition, it connects the districts of steilshoop in the west, wellingsbüttel in the northwest, and rahlstedt in the east as an important part of the main road network. parallel to this tender, the lots for garden and landscape construction (plantings) (special lots 1 & 2) and the construction of a barrier-free ramp, including retaining walls at the southeastern subway exit (construction lot 2) are being tendered. key services: remove bitumen roadway 10,200 m², remove concrete slab in bus traffic areas 600 m², profile and dispose of soil 5,200 m³, construct full bituminous roadway 9,500 m², create watercourse from ma 8 s 360 m², construct concrete slab in bus traffic areas, d = 28 cm 1,250 m², side area in paving construction 8,270 m², create layer from frost-resistant material 2,000 m³, create gravel base layer, d = 30 cm 12,000 m³, set granite curbs 1,900 m, set special curbs 190 m, construct road drains 71 pcs, construct connection line, dn 150, pp, 700 m. estimated value excluding vat: 6565346.28 eur.U-bahn farmsen, construction section 1, road construction (lot 1)