📋 Tender Overview
Contract awarded for Architectural/object planning services for the energy renovation of the valentin-ostertag school in bad dürkheim lot-0001, title: architectural / object planning services for the energy renovation of the valentin-ostertag-school bad dürkheim, description: the city of bad dürkheim intends to energetically renovate the building envelope and the technical building equipment (tga) as well as specific additional measures at the valentin-ostertag-school. the subject of this tender is the object planning services for buildings and interiors according to § 34 hoai (service phases 1 to 9, stepwise commissioning) including basic and special services as well as the consulting and planning services of building physics (annex 1 no. 1.2 hoai). scope of construction measures: funded energy renovation: renewal and insulation of the roof and facade structures, replacement of all windows, post-and-beam facades and exterior doors as well as dismantling of the parapet elements. installation of summer heat protection (south side: blinds; north side: solar control glazing). replacement of the gas heating system with an air-water heat pump including digital thermostat valves. installation of decentralized ventilation systems with heat recovery and co2 control in classrooms/teachers' rooms as well as individual room ventilators in the offices. non-funded / separately billable measures: renovation of the ground floor sanitary facilities (temporally decouplable), stairwell enclosure (fire protection), enlargement of the basement windows with direct exits to the schoolyard as well as interface coordination for a pv system of the municipal utilities bad dürkheim. requirements and boundary conditions: ongoing operation & deadline specification: the construction measure takes place during the ongoing all-day school operation to reliably meet the completion deadline set in the efre funding notification by september 15, 2028. alternative areas: the use of interim containers should be avoided. if necessary, the caretaker's apartment, the daycare center, and specialized rooms in the basement are available as alternative areas. construction process & prefabrication: to adhere to the schedule, maximizing the degree of prefabrication (e.g., sandwich panels for roofs, wooden frame components for parapets/windows) is mandatory. emission & deadline management: creation of a coordinated schedule and process plan. emission-intensive work (noise, dust, vibrations) must be scheduled during school holidays. approval requirement: the project requires approval due to facade changes (especially in the basement) and the installation of ventilation; this must be factored into the process planning. pollutant management: existing building pollutants (asbestos-containing fiber cement roofing, kmf/asbestos-containing heating pipe insulation) require strict pollutant management with demolition phases spatially and temporally separated from school operations. the measure will be implemented with funding (including efre). the requirements of the funding providers as well as the school construction guidelines of rhineland-palatinate must be observed. at the same time, engineering services for tga and structural planning will be tendered. estimated value excluding vat: 322567.80 eur.Architectural/object planning services for the energy renovation of the valentin-ostertag school in bad dürkheim