📋 Tender Overview
Contract awarded for 2025-1004709_airport munich_project management services t/complete renovation module a lot-0002, title: project management costs, description: munich airport gmbh [fmg] plans the general renovation of module a of terminal 1. this essentially involves the decommissioning/closure, the dismantling of the existing structure down to the shell (with the exception of the baggage handling system on level 03 along with the connections to check-in and baggage claim on level 04 as well as the conveyor systems essentially on level z3) followed by new construction including new technical systems and facades without significant changes to the previous volume of the existing structure. the orderly decommissioning should, if necessary, be planned to overlap or be partially parallel to the dismantling and new construction and implemented as an advance service. the project is divided into three sub-projects (tp): 1. decommissioning/closure of the module while maintaining the functionality of the remaining terminal; 2. dismantling of the interior construction including tga as well as facade and possibly roof structure (returning the module to shell condition); 3. new construction including tga as well as facade and possibly roof structure (kgr 300 + 400 + 900); necessary measures of tp1 should be awarded individually (planner, execution). necessary measures of tp2 should also be commissioned to individual planners and for implementation preferably to individual contractors. necessary measures of tp3 should be planned as much as possible to the same individual offices as tp2. it is planned to involve a general contractor (tu) consultatively by the middle of the service phase (lph/hoai) 2 until the completion of lph 3. upon completion of lph 3, the client reserves the right to choose option 1 "tu for the further planning and construction phases (until completion of lph 8)" or to switch to option 2 individual awards for planning and construction. the services of project management (ps) include in the first commissioning part (project phase 1) the lph 1-8 of tp 1 + 2 as well as the lph 1 - 4 for tp 3. furthermore, for tp 3 in option 1 for lph 5-8, the services planning / construction execution with a tu and with option 2 with individual companies are to be provided. this is advertised and to be offered for the sub-project 3 new construction in separate service profiles. the focus of the ps in project phase 1 is: 1. overall project management services 2. project preparation 3. planning preparation and management & tu-competence competition 4. execution preparation & management 5. execution 6. cost planning & management 7. project completion detailed information on the scope of services can be found in annex 1: project management 2 - service profiles 1 - 3 with titles 1 - 7. overall, a project duration of about 6.5 - 7 years from the commissioning of project management is currently assumed; the awarding of services is subject to the client's committee approval due to the anticipated order volume. estimated value excluding vat: -1.00 eur.2025-1004709_airport munich_project management services t/complete renovation module a