📋 Tender Overview
Contract awarded for A44, vke d061, ratingen - velbert in section a 3 - l 156 - planning of traffic facilities phases 3 and 5 lot-0000, title: a44, vke d061, ratingen - velbert in section a 3 - l 156 - planning of traffic facilities lph. 3 and 5, description: overview of project a 44 ratingen - velbert in section a 3 - l 156 the project "a 44 ratingen - velbert in section a 3 - l 156" includes the new construction of a section of the a 44. the approved and relevant section of the a 44 for the construction task begins west of the ratingen-ost motorway triangle (a 3 / a 44) at construction km 13+130.000 (south side) or 13+640.000 (north side) and ends at the heiligenhaus junction (a 44 / b 227) at approximately construction km 19+500. the new section connects the western part of the a 44, including the düsseldorf airport and trade fair connection, with the existing section of the a 44 in the east, known as the velbert northern bypass. the motorway triangle (ad) ratingen-ost located in the section will be converted into a motorway interchange (ak). the heiligenhaus junction (as), which was partially provisionally constructed and put into operation for the already completed eastern section of the a 44, is also to be fully constructed as a junction. the completion of the a 44 will create a continuous east-west connection for long-distance traffic between essen and mönchengladbach. planning task (1) the execution planning for the traffic facility a 44 between the construction start west of the ak ratingen-ost and construction km 18+500 has been completed. the a 44 is in operation from approximately construction km 19+500. the task includes the planning of the traffic facility between construction km 18+500 and approximately construction km 19+500. in the planning section between construction km 18+500 and approximately construction km 19+500, the traffic facility as heiligenhaus is also to be planned alongside the traffic facility a 44. the l 156 is an integral part of the planning task for the connection to the as heiligenhaus. according to hoai, section 4 traffic facilities, the design planning (lph. 3) and execution planning (lph. 5) are to be planned. (2) an execution planning of the traffic facility a 44 and the traffic facility as heiligenhaus with the status "preliminary draft" from 2017 is already available. digitally, these planning documents are only available in pdf and plt format. the existing plans can be used as a rough orientation. it is expressly pointed out that the contractor must independently and responsibly create their plans. the execution plans available in the preliminary draft are not a template for the contractor. (3) an integral part of the planning task is also the phased reconstruction and dismantling as well as the final construction of the currently provisionally constructed and operational as heiligenhaus. the reconstruction will take place in several construction phases to be planned by the contractor while maintaining traffic at the existing junction. in the context of the planning, all necessary traffic phase-related measures to ensure a continuous traffic flow - including provisional traffic guidance, relocations, and necessary provisions for junctions, turning, and merging areas - must be developed in detail. in particular, the requirements for traffic guidance and traffic safety during the construction period, the technical-construction transitions between provisions and final state, as well as the construction operational processes to minimize traffic disruptions must be taken into account. (4) the contractor plans to dismantle the asphalted construction site setup area in the as heiligenhaus area. the dismantling can be carried out in one operation without additional traffic safety measures. for further details, see annex c_02, service description. estimated value excluding vat: -1.00 eur.A44, vke d061, ratingen - velbert in section a 3 - l 156 - planning of traffic facilities phases 3 and 5