📋 Tender Overview
Contract awarded for 26v0120aoo - assistance mission for project management and programming for the construction of a central kitchen with a capacity of 36,000 meals/day as part of a global design-build contract. lot-0000, title: 26v0120aoo - assistance mission for project management and programming for the construction of a central kitchen capable of producing 36,000 meals/day as part of a global design-build contract, description: the purpose of this contract is to carry out a mission of assistance to project management (amo) and programming for the design and construction of a central kitchen intended to ensure the production of approximately 36,000 meals per day for the needs of the city of toulouse. these meals are primarily intended for schoolchildren and seniors. this operation is part of a global design-build contract in accordance with the provisions of article l.2171-2 of the public procurement code. the mission entrusted to the contractor aims to: - precisely define the functional and technical needs; - analyze the constraints of the site and the operation; - develop the programmatic documents serving as a reference for the design-build consultation; - assist the project owner in the awarding and attribution of the design-build contract; - assist the project owner on regulatory issues; - ensure compliance control of the project with the defined objectives; - support the project owner for the commissioning of the equipment, the follow-up of the perfect completion guarantee (gpa), and the settlement of contracts. the contractor is subject to a general obligation of advice and alert throughout the duration of the contract. nb: the awardee or member of the awardee group of this contract may not, under any circumstances, be a candidate for the next design-build contract concerning the project for the construction of a central kitchen of 36,000 meals/day. the services are settled by fixed prices. estimated value excluding vat: 271600.00 eur.26v0120aoo - assistance mission for project management and programming for the construction of a central kitchen with a capacity of 36,000 meals/day as part of a global design-build contract.