PMGSY Tenders WB | West Bengal Government Tenders
West Bengal government tenders
- Transportation Railways


LOCATION SUMMARY DEADLINE
West Bengal Supply Of Poh Kit For Escorts Parking Brake Cylinder Etc
Poh Kit For Escorts Parking Brake Cylinder (rubber Kit) Consistings Of 05 Items (drg.no - 2kb 4104) As Per Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ]

25 Apr 2024
West Bengal Supply Of Set Of Nuts And Washers For Bhel Ac Tm
Set Of Nuts And Washers For Bhel Ac Tm As Per Annexure 2 Enclosed [ Warranty Period: 30 Months After The Date Of Delivery ]

07 May 2024
West Bengal Supplying Of Chairs , Tables For The Use Of Capf To Be Installed In Different Places P.s Pandua, For Upcoming General Election- 2024
22 Apr 2024
West Bengal Supply Of Axle Box Spring
Axle Box Spring To Drg. No. Wd-04050-s-02, Item No. -4, Alt.- Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]

07 May 2024
West Bengal One Time Renovation Of Railway Line Plant Area Ctps Yard
Estimated Cost :2033999 INR
16 May 2024
West Bengal Supply Of Roller Guide
Supply Of Supporting Channel For Roller Guide Arrangement Of Side Lower Berth For Lhb Coach No.-er 205136 And Er 205140 As Per Drg. No. Sk. No.-llh-12/2023,alt.-nil [ Warranty Period: 30 Months After The Date Of Delivery ]

24 Apr 2024
West Bengal Supply Of Running Contract For Supply Of Gfn Liner 60 Kg To Rdso Drg. No. T-3706
Gfn-66 Insulating Liners As Per Rdso Drawing No. T-3706 And Conforming To Irs Specification No. T-44-2023 For Use With Erc Mk-iii Flat Toe For 60 Kg. Rails On Concrete

13 May 2024
West Bengal Supply Of Packing Saddle Etc
Packing Saddle Copper Ri 1174 As Per Core Drg No-re/33/p/1174 Mod-b Or Latest And Rdso Spec: Ti/spc/ohe/fitting/0130(10/13), Rivision 1 [ Warranty Period: 30 Months After The Date Of Delivery ]

25 Apr 2024
West Bengal Miscellaneous P.way (zonal) Track Works Up To 30.09.2026 In The Section Of Sse (p.way)/hij And Sse (p.way)/dnt Under The Jurisdiction Of Aden (south)/kgp.
Estimated Cost :127246786 INR
13 May 2024
West Bengal Supply Of Procurement Of Double Leaf Door Arrangement Suitable For Uic Vestibule Etc.
Double Leaf Door Arrangement Suitable For Uic Vestibules As Per Rcf's Drg No- Cc-25454, Alt-c (small C). [ Warranty Period: 30 Months After The Date Of Delivery ]

16 May 2024