MP Tenders | MP Tenders Gov | Madhya Pradesh Tenders
Madhya Pradesh government tenders
- Infrastructure Roads and Highways


LOCATION SUMMARY DEADLINE
Madhya Pradesh Construction of Commercial Shops, Retaining Wall in Ward No. 13 and C.C. Road in Ward No. 08, Nagar Parishad, Niwas under CM Urban Infrastructure Development Scheme Phase IV
Estimated Cost :12683535
25 Apr 2024
Madhya Pradesh Execution Of Balance Works Of Construction Of Residential Buildings At Marwasgram , Beohari , Road Works At Nkj An Khanna Banjari And Other Misc. Associated Works Like Development Works Such As Approach Roads, Drainage, Water Supply, Horticulture Etc
26 Apr 2024
Madhya Pradesh Improvement Of Road Surface By Providing Rubberized Surface At Level Crossing No.110 (maksi-bhopal Section) & 254x (ratlam - Khandwa Section).
Estimated Cost :4000393 INR
24 May 2024
Madhya Pradesh Repair And Maintenance Of Gm Office Complex Along With Its Approaches At Dudhichua Project For A Period Of Two Years
Estimated Cost :7816413 INR
06 May 2024
Madhya Pradesh Up-gradation Of Shyampur To Sabalgarh Road Section Of Nh-552ext. From Km 111.800 To 166.850 To Two Lane With Paved Shoulder Configuration In The State Of Madhya Pradesh On Hybrid Annuity Mode.
Estimated Cost :6299400000
07 May 2024
Madhya Pradesh Upgradation of State Highways under Package No. 1 on EPC mode under Proposed NDB Loan
Estimated Cost :2205900000
08 May 2024
Madhya Pradesh Upgradation of State Highways under Package No. 6 on EPC mode under Proposed NDB Loan
Estimated Cost :4325300000
08 May 2024
Madhya Pradesh Upgradation of State Highways under Package No. 7 on EPC mode under Proposed NDB Loan
Estimated Cost :3220100000
08 May 2024
Madhya Pradesh Rejuvenation Work of Khajri Talab Chhindwara Under Amrut 2.0 Scheme Construction of Pitching, Bund, Eco Friendly Pathway, West Weir, Parking, Plantation, Compound Wall, Light, Railing Around Pond, Bench.
Estimated Cost :21185000
30 Apr 2024
Madhya Pradesh Upgradation of State Highways under Package No. 9 on EPC mode under Proposed NDB Loan
Estimated Cost :2956900000
08 May 2024