Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Delhi Maintenance Of Various Colonies Under Nazul A/c-ii Dwarka Zone
Desilting Of Drain Of Dwarka Flyover Under Jurisdiction Of Project Division 5.

Estimated Cost :2803646 INR
24 Apr 2024
spanspan>-1-X-3.20-M)-Of-bridgespan>-No.32-At-Km-327/5-6,- Punjab spanspan>-1-X-3.20-M)-Of-bridgespan>-No.32-At-Km-327/5-6,-Replacement Of Existing Early Steel Girder (spanspan> 1 X 3.20 M) Of bridgespan> No.32 At Km-327/5-6, spanspan>-1-X-3.20-M)-Of-bridgespan>-No.32-At-Km-327/5-6,-13 May 2024
Delhi Upgradation To 4 Laning Of Barabanki To Ghargra Bridge Start Section Of Nh- 927 From Km 0.000 To 32.800 (existing Chainage Km 1.720 To Km 34.295) In Uttar Pradesh On Ham Mode Under Nh(o) Scheme (package-i).
Estimated Cost :5503500000
28 May 2024
Odisha Construction Of 6 Lane Stand Alone Bridge At Ib River At Kanaktora Jharsuguda Section Of Nh 49 On Epc Mode In The State Of Odisha.
Estimated Cost :735300000
30 May 2024
Uttar Pradesh Construction Of 4 Lane Bridge At Ghagra River With Approaches And Rob From Km. 32.800 To Km. 39.800(existing Chainage Km 34.295 To Km 43.270) Section Of Nh-927 In Uttar Pradesh On Epc Mode Under Nh(o) Scheme (package-ii).
Estimated Cost :3544100000
28 May 2024
West Bengal Supply, Installation, Testing And Commissioning Of S&t Portion Of Work In Connection To Provision Of 12.0 M Wide Fobs Under Abbs Scheme In Kgp-tata Section Including Kgp- Mdn Section Under Jurisdiction Of Sse/s/rri/kgp, Sse/s/west/kgp, Sse/s/nmp, Sse/s/gt
Estimated Cost :3922444 INR
15 May 2024
Andhra Pradesh Kottavalasa- Koraput Doubling Project - Assembling And Launching Of Girder Components, Supply And Fixing Of Bearings, H-beam Steel Sleepers On Major Bridge No.543 (10x45.7m Owg) Over Kolab River Between Koraput - Suku Stations On Kk Line Of Waltair Divisi
Estimated Cost :109952201 INR
17 May 2024
Maharashtra Signaling Work In Connection With (1) Ukai Songadh-jalgaon Section- Replacement Of Stone Slab Bridges By Providing Box Culverts .(total 21 Nos) (2)churchgate-jalgaon Sec. Repl. Of Corroded Steel Girders By Precast Rcc/psc Slab On Bridges Total
Estimated Cost :7900247 INR
14 May 2024
Maharashtra Signalling Work In Connection With (1) Udhna Ukai Songhad - Section:-providing Subway In Lieu Of Lc No.42,55 (total 2 Nos.) (2) Proposed Limited Height Subway At Ac 68 At Km 149/22-24 (dfcc Ch149-22) Between Station Sanjan And Bhilad.(3) Udhna-ukai Songha
Estimated Cost :6379529 INR
13 May 2024
Gujarat Telecom Work In Connection With Rehabilitation Of Br. No. 502 (narmada River) As Per Recommendations Of Third Party Audit Report; Between Kms 323/32 To 325/10; Between Stations Ankleshwar And Bharuch Station Of Vadodara Division. (2). Vadodara-geratpur Se
Estimated Cost :5196978 INR
17 May 2024