Tenderskhoj
India
- Industry Fire Safety and Security
LOCATION SUMMARY DEADLINE
Maharashtra Purchase Of The Article – Suit Fire Retardant/proximity Suit With Head Protector And Shoes .
08 Apr 2024
Gujarat Supply Spare For Helium Leak Testing Machine, Spare 'filament Assembly, Hot Source' For Helium Leak Detector Machine, Part No: Vsfldfr, Make: M/s Phoenix Industrial Solutions, Model: Pis-vs-30 , Spare 'tc Convector Vaccum Sensor'for Helium Leak Detector M
18 Apr 2024
Tamilnadu Supply Of Ldo Flow Control Valve Lofcv Nb25 1 , Gland Packing , Actuator Diaphragm For Fo, Valves 6 , Bfg U Seal Water Fill Line Buw04a Nb150 1 , , Burner Trip Valves Air Nb25 2 , Burner Trip Valves, Ldo Nb25 3 , Ldo Main Trip Valve Lo30 Nb40 4 , Cog U, S
01 Apr 2024
Jammu & Kashmir Supply Of Long Exercise Book, Note Book, Geomatry Box, Blue Pen, Black Pen, Wax Colour, Drawing Book, School Bag, Practical Notebook, Pencil, Eraser, Scale, Duster, Multi Colour Chalk, White Chalk - Stationary Items Qty : 12336
Estimated Cost :550000 INR
18 Apr 2024
Maharashtra Supply Of Bags For Sdm Coference
Estimated Cost :1000000 INR
08 Apr 2024
Andaman and Nicobar Islands (UT) Repair Of Automatic Fire Detector Service (fire Alarm System) At Sho(pb) Port Blair (q3) Qty : 1
18 Apr 2024
Madhya Pradesh Supply Of 00010 M4650016003 He Radial Soft Seal, 060-0705-168- A3 (q3), 00020 M4650016002 Ce Radial Soft Seal, 060- 0705-176-a3 (q3). Qty : 16.
18 Apr 2024
Himachal Pradesh Project Innovation Toys Library, Lacing Set Wooden , A To Z - Capital , A To Z - Small , Hindi Consonant , Fruits Puzzle , Transport Puzzle , Vegetable Puzzle , Animals Puzzle , Fruit Set Bag , Vegetable Set Bag , Jungle Safari Puzzle , Large Building Blo
Estimated Cost :2 INR
30 Mar 2024
Kerala Annual Maintenance Of Integrated Security Surveillance System - Monitor Operations, Building Management System, Health Monitoring Solution For Cctv System, Theft Prevention, Parking Lots, Public Safety; Comprehensive; Hardware, Software, Networking System
30 Mar 2024
Tamilnadu Cmrl/o&m/ Civil Maintenance/ Canopy Maintenance/cm-01/ 2024, installation Of Fall Arrest System Over The Roof Coverings And Enhancing The Strength & Stability Of The Existing Roof Covering In 19 No’s Elevated Station.(including The Roof Covering Over The
Estimated Cost :49900000 INR
02 May 2024