Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Kerala Construction Of Zoological Park At Puthur.
Construction Of Artificial Roack Stream And Tanks, Closing Of Existing Fence In Lion Exhibit And Steel Bridge In Gharial Exhibit.

Estimated Cost :3493273 INR
02 May 2024
West Bengal Open Tender Of Balance Quantity For Construction Of Lhs In Lieu Of Lc Gate No. 6/c/e In Between In Jgd-mmd In Mdp-grd Section
Estimated Cost :42371264 INR
22 May 2024
West Bengal Open Tender For Rcc Jacketing Of Br.no.10 & Br.no.41 In Udl-bmga, Br.no.52 In Ikr- Jamuria-bbi-chinchuria-stn & Br.no.49up In Bmga-snt With Other Ancillary Work Under Aen/ii/udl In The Jurisdiction Of Sr.den/4/asansol.
Estimated Cost :61246913 INR
20 May 2024
West Bengal Const. Of Shilpa Setu Over River Damodar At 2.95km. Parallel To The Ex. Krishak Setu Of Burdwan-arambagh Rd (sh-7) And Construction Of Bridge Over Eden Canal At 2.415km Of Burdwan-arambagh Rd (sh-7) Under Bardhaman Div, Pwd
27 May 2024
Maharashtra Proposed Construction Of A 2 Lane Rob Along With Rub In Lieu Of Level Crossing No. 246 At Kms. 813.493 On Itarsi - Amla Section Of Division.
Estimated Cost :220633911 INR
24 May 2024
Maharashtra Proposed Construction Of A 2 Lane Rob Along With Rub In Lieu Of Level Crossing No. 258 At Kms. 855.207 On Itarsi - Amla Section Of Division.
Estimated Cost :272001069 INR
24 May 2024
Odisha Regirdering Of Important Bridge No.950 Up & 950 Dn (rushikulya River) Having Through Open Web Girders Of Bgml Loading Standard In Sse/br/south/kur Jurisdiction Under Sr.den(bridge), Khurda Road In Connection With Mission 3000 Mt.
Estimated Cost :732190184 INR
15 May 2024
Chhattisgarh Provision Of Road Under Bridge For Closure Of Manned Level Crossing No. Dd-27 At Km.896/8-9 In Durg-dallirajhara Section.
Estimated Cost :43302743 INR
16 May 2024
Madhya Pradesh Construction Of Rob At Lc No. 08 At Km 998/0-2 On Bina-katni Section Of Division Of West Central Railway.
Estimated Cost :106915332 INR
17 May 2024
Uttar Pradesh Electrical Work In Connection With "utility Shifting In Connection With Construction Of Rob From Gt Road To Airport Via Near Sfg By Upsbcl".
Estimated Cost :7548362 INR
15 May 2024