Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Madhya Pradesh Construction Of Road Over Bridge In Lieu Of Lc No.255 At Km 844 /8-10 Between Nishat Pura - Sukhi Sewania Station In Bpl- Bina Section Of Division On West Central Railway
Estimated Cost :148730289 INR
17 May 2024
Bihar Electrical Work In Connection With At Narkatiaganj- Provision Of 12m Wide Fob With Ramp For Development Of Station Under Amrit Bharat Station Scheme.
Estimated Cost :1347962 INR
16 May 2024
Maharashtra Ohe Modification In Connection With:- 1) Construction Of 5m Wide Fob Connecting East And West Of Prabhadevi/parel Station. 2) Extension Of Curry Road Station Middle Public Fob Towards East Side At Km 5/8-9 For East To West Connectivity To Public. 3) Const
Estimated Cost :69936816 INR
24 May 2024
Bihar Provision Of 12m Wide Foot Over Bridge At Barsoi Under Division.
Estimated Cost :87336453 INR
20 May 2024
West Bengal Provision For Re-girdering Of Bridge No. 80t In Bangaon-petrapole Section Of Sealdah Division.
Estimated Cost :30607599 INR
21 May 2024
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No.190 And 193 At Km.251/300-400 And Km.257/000-100 Respectively In Vm-tpj Chord Line Section.
Estimated Cost :120782324 INR
27 May 2024
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No.194 And 195 At Km.258/100-200 And Km.260/200-300 Respectively In Vm - Tpj (chord Line) Section.
Estimated Cost :109019746 INR
27 May 2024
West Bengal S & T Work In Connection With (i) Malda Town- Capacity Increase Of Goods Train Examination Facilities (under Vision 2024) (2) Construction Of Subway In Leau Of Lc Gate No 58 At Km 251/5-6 Bet Stn Dgle-nfk In Nfk-az Section Of Division (3) Provision Of Hig
Estimated Cost :21456326 INR
15 May 2024
Assam Construction Of Sub Structures & Super Structure Of Ow Steel Girder (1 X 61.00 M ) In Connection With Iocl Siding Line And Shunting Neck Line Under The Jurisdiction Of Den-v/lmg At Skke. (two Packet System)
Estimated Cost :122482465 INR
20 May 2024
Jharkhand Provision Of New Fob In Place Of Existing Corroded Fob, At Station Barajamda Rly.station And Extension Of Existing Fob From Up Platform No. 2 To Sick Line Yard At Opposite End Of Dps Station Under Jurisdiction Of Den(south)/ckp.
Estimated Cost :76099323 INR
16 May 2024