Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Jharkhand Construction Of 1600 M Pcc Road With 2 Nos Hume Pipe Culvert And 1 No Chhalka Bridge From House Of Zaheer Miya To Jamuntanr Vill Mayapur Panchayat Mayapur Block Garu Dist
12 Apr 2024
Assam Construction Of Spt Bridge Including Approaches At Tamulorghuli 16 Mile To Majuli Connecting Path Over River Subansiri Under Sopd Tsp For The Year 2023.24
Estimated Cost :33282819 INR
10 Apr 2024
Gujarat Bridge.
Construction Of Balot-vanthli Road ( Ch 00/000 To 03/250), Dist. : Junagadh Under Mmgsy (mukhya Mantri Gram Sadak Yojana)-scsp(ew To Bt)-2022-23.

Estimated Cost :83078026 INR
12 Apr 2024
India Design And Construction Of Broad Gauge Ballastless Track Including Proof Checking, Supply, Installation, Testing And Commissioning In Between Tihi- Pithampur Station In Tunnel No.1 (approx. Length Of Tunnel 2.967 Km. Approx. Length Of Blt 3.10 Km) With Al
Estimated Cost :197466251 INR
23 Apr 2024
Gujarat Design, Engineering, Supply, Erection, Commissioning & Testing Of 60 Mt Capacity Pitless Type Fully Electronics Weighbridge System For Main Store Of 2x250 Mw Unit- 3 & 4 Stps.
Procurement, Installation & Commissioning Of 220 Kv Cable Busing End Term

Estimated Cost :2015000 INR
06 Apr 2024
Gujarat Construction Of Causeway Modpar Jasapar Road Ch. 0/00 To 4/700.
Estimated Cost :809746 INR
08 Apr 2024
Gujarat Construction Of A Bridge Across River Mahi On Road Joining Moti Rath To Royaniya Rathada Bet, Dist. Mahisagar.
Estimated Cost :210611953 INR
04 Apr 2024
West Bengal Extra Ordinary Repair Of Ibb Roads In The Stretches Under Ibbr 56 57 62 64 67 68 69 70 75 And Link Roads Total Length 200.05 Km, Culver Repair 236 Nos. And Bridge Painting 10 Nos. In The State Of West Bengal And Assam Along Indo Bangladesh Border.
E

Estimated Cost :449064 INR
03 Apr 2024
Madhya Pradesh Construction Of Culvert And Approach Road Ar The Path Of Amleta S/s Under O&m Circle.
Area Fencing At Left Side At 33111 Kv S/s Dhikwa Under O&m Circle Ratlam.
Construction Of Approach Road At Vinoba.

11 Jan 2024
India Supply Of Project Monitoring (once In 30 Days) By Using Arial Geospatially Uas Of The On-going Project Including Important Major Structure Like Bridge, Rob, Rub, Fob & Station Yard Etc. In Connection With New Line / Doubling/ Third Line / 3rd & 4th Line /
Estimated Cost :5037000 INR
18 Apr 2024