Tenderskhoj
India
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Gujarat Civil Work.
19 Apr 2024
West Bengal Supply & Delivery Of Upvc Consumables With Drilling Related Allied Works And Providing Skilled & Unskilled Manpower & Hiring Supporting Vehicles For Dept. Rig Unit For Sinking Of (125 Mm X 100 Mm X 135 Mtr) Rbtw By Rotary / Combination Method And Installa
Estimated Cost :740307 INR
03 Apr 2024
Haryana Site Survey, Planning, Design, Engineering, Assembly Manufacturing, Testing, Supply, Loading, Transportation, Unloading, Insurance, Delivery At Site, Handling, Storage, Installation, Testing, Commissioning And Documentation Of All Items/material Required
Estimated Cost :247142571
22 Apr 2024
Gujarat Construction Of New Depot Manager Quarter At Gandhinagar, Division.
Estimated Cost :3065859 INR
18 Apr 2024
Haryana Site Survey, Planning, Design, Engineering, Assembly Manufacturing, Testing, Supply, Loading, Transportation, Unloading, Insurance, Delivery At Site, Handling, Storage, Installation, Testing, Commissioning And Documentation Of All Items/material Required
Estimated Cost :101030354
22 Apr 2024
Uttar Pradesh Roof Treatment, Strengthening And Other Necessary Related Civil Works Of 33/11 Kv Power Sub-station Tarun, Dilasiganj, Milkipur, Makhapur, Bikapur, Gyaspur Under Zone.
Estimated Cost :1675996 INR
09 Apr 2024
Delhi Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Others; Electrician Qty : 1
17 Apr 2024
Haryana Site Survey, Planning, Design, Engineering, Assembly Manufacturing, Testing, Supply, Loading, Transportation, Unloading, Insurance, Delivery At Site, Handling, Storage, Installation, Testing, Commissioning And Documentation Of All Items/material Required
Estimated Cost :108211276
22 Apr 2024
Uttar Pradesh Roof Treatment And Strenghtening Work At 33/11 S/s Bawan, Atrauli, Baghauli, Gopamau, Hariyawa District- .
Estimated Cost :1598811 INR
06 Apr 2024
Madhya Pradesh Labour Contract For Repairing And Reconditioning Of Distribution Transformers Of 16/ 25/63 & 100 Kva Capacities At Stru, Maxi, Ee(store), .
15 Jan 2024