Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Assam Carry Out 4 Yearly Maintenance, Cleaning, Painting And Changing Of Hangar Units, Of Railway Bridge Crossing Of 14" Ml Nbpl At River Donk (nbpl Km 866.7).
16 May 2024
Uttar Pradesh Construction Of 100ton Weigh Bridge Foundation For Molasses And Sugar Sale(pitless).
Estimated Cost :603802 INR
22 Apr 2024
Rajasthan Construction Of Box Culvert At Shri Nath Puram Sector A.
Estimated Cost :3640000 INR
25 Apr 2024
Bihar Construction Of High Level Rcc Bridge (3x14.50m) In 10th Km Of Ujjan-ghanshyampur Road.
Estimated Cost :86282000 INR
16 May 2024
Uttar Pradesh Project Supervision Services (pss)' For "planning, Execution, Quality Control And Supervision For All Bridge, Civil Works, P.way And General Works In Connection With Pt. Deen Dayal Upadhyay-prayagraj 3rd Line Doubling Project In Division Of North Central
Estimated Cost :40646465 INR
31 May 2024
Jharkhand Balance Work Against Work For Replacement Of Corroded Top Flange Plate, Corroded Head Loss Rivets Of Bridge No. 156 Up, 378 Dn, Replacement Of Corroded Rivets Of Br. No. 378 Up, Replacement Of Cracked Intermediate Cross Frame Stiffeners And Provision Of A
Estimated Cost :9325310 INR
09 May 2024
West Bengal Replacement Of Deck Plate Of 30.5m U/s Girders Of Bridge No. 409 Up (5x12.2+5x30.5mg) At Km- 310/31- 311/9 Bet. Sntd-bje On Ada-gmo Section Including Re-spacing Of Steel Channel Sleepers And Shifting Of Ohe Masts From Girders To Piers For Bridge No 409 Up
Estimated Cost :11179018 INR
09 May 2024
Uttar Pradesh Construction Of Integrated Robs And Rubs For Elimination Of Lc No. 496 And Area Under Gq-gd Routes Lc No.77 In Af-bxn In Agra And Rob Of Span 1x24m Composite Grider + 1x72m Bow String Girder Over Ldgah Station Yard As Deposit Works.
Estimated Cost :1209600000 INR
14 May 2024
India Tk-rdg New Line:- 1) Remodelling Of Rayadurga Yard-a) Construction Of Earthwork In Bank, Construction Of Minor Bridge, P.way Work And Supply Of Ballast Etc., Complete. B) Proposed Tower Wagon Shed , C) Proposed Track Machine Siding. 2) Proposed Ballast Si
07 May 2024
Bihar Construction Of Fob, High Level Platform No. 1, 2 & 3 And Other Miscellaneous Work At Ankorah (anh) Yard In Connection With Construction Of 3rd Line From Sonnagar To Garhwa Road In Ddu Division Of East Central Railway.'
Estimated Cost :67499940 INR
25 Apr 2024