Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Construction Of Rc Bridge For Asw Pipeline For Unit No.4 At Npcil Taps-3and4.
Estimated Cost :6531979 INR
13 May 2024
India Dismantling Of Left-over Trough Girder/angle Fitted On Cross Girder Of Important & Major Bridge No. 5a (up Line) , 63 (dn Line), 65 (up & Dn Line ) On Snl-att Section, Fzr Div. Under The Jurisdiction Of Sse/br/m/juc.
Estimated Cost :2210728 INR
13 May 2024
Uttar Pradesh Rebuilding Of Major Bridge No.46 (7x12.2 M-psc Slab) Between Gularbhoj-bazpur Station Of Lalkuan-kashipur Section Under Aden/kpv Of Izzatnagr Division.
Estimated Cost :115983340 INR
15 May 2024
spanspan>-Style="color:black;-Background-color:-#ffb3ba;">robspan-Style="color:black;-Background-color:-#ffb3ba;">spanspan>>-Of-sp"> India spanspan>-Style="color:black;-Background-color:-#ffb3ba;">robspan-Style="color:black;-Background-color:-#ffb3ba;">spanspan>>-Of-sp">Construction Of <spanspan> Style="color:black; Background-color: #ffb3ba;">robspan Style="color:black; Background-color: #ffb3ba;">spanspan>> Of sp
Estimated Cost :324419076 INR
spanspan>-Style="color:black;-Background-color:-#ffb3ba;">robspan-Style="color:black;-Background-color:-#ffb3ba;">spanspan>>-Of-sp">15 May 2024
Sikkim Supply Of Bailey Bridge 80 Ft Td Ew (q3). Qty : 3
24 Apr 2024
Karnataka Maintenance Works From Tunnel Exit-10km Chainage To 18km Chainage In Kiocl Pipeline Corridor, Kiocl Limited, Nooralbettu.
13 May 2024
Sikkim Supply Of Bailey Bridge 60 Ft Dd Ew (70r) (q3) Qty : 2
24 Apr 2024
India Construction Of Rc Bridge For Asw Pipeline For Unit No.4 At Npcil Taps-3and4.
13 May 2024
Maharashtra Strengthening Of Light Vehicle Road By Concreting From Fly Over Bridge No.1 (naigaon) To Fly Over Bridge No.2 (gaurav) At Neeljay Subarea Of Wani Area.
Estimated Cost :10976085 INR
08 May 2024
Uttar Pradesh Widening Of Existing Bridge No. 82 At Km 1230/3-5 By Providing Rcc Box Between Mnr- Fzd Stations In Cnb Tdl Section Of Division
Estimated Cost :55032147 INR
28 May 2024